Similar Projects
River Road Culvert Replacement
Infrastructure
Bidding
$300,000 est. value
Gladwyne, PA 19035

Coach Mcnelly Stadium - Egress Enhancements
Post-Bid
Royersford, PA 19468

Abington Environmental
Term Contract
Post-Bid
Abington, PA

2020 for Ironstone Creek Streambank Stabilization Project
Results
Gilbertsville, PA 19525

Well 26 Access Driveway and Box Culvert
Results
$350,000 to $450,000 est. value
Horsham, PA 19044

Sinkhole Repairs
Infrastructure
Post-Bid

Swamp Creek Road Culvert Replacement
Results
$70,000 est. value
Schwenksville, PA

New Sandy Run Middle School - Shoring
Infrastructure
Post-Bid
Dresher, PA 19025

State Game Lands #183 Shooting Range Improvements
Results
Palmyra, PA

Upper Perkiomen Middle School Basin Stabilization
Infrastructure
Post-Bid
$400,000 est. value
Pennsburg, PA 18073

Chesapeake Bay Watershed Pollution Reduction
Infrastructure
Results

Jenkintown Stream Restoration
Infrastructure
Post-Bid
$850,000 est. value
Jenkintown, PA 19046

Potshop Road Culvert Matting
Infrastructure
Results
East Norriton, PA 19403

Borough of Ambler - Tannery Run CMP Arch Replacement
Infrastructure
Post-Bid
$88,000 est. value
Ambler, PA 19002

Bridge, Culvert, and Ford Repair - Various Locations
Renovation, Infrastructure
Results
$350,000 est. value
Gladwyne, PA

Last Updated 06/29/2022 07:06 AM
Project Title

Perkiomen Creek Tributary Floodplain Restoration

Physical Address View project details and contacts
City, State (County) PA   (Montgomery County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $300,000 to $400,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Mobilize equipment, personnel and materials to the project site as necessary tomconstruct the project improvements. Includes all associated travel, fuel, rental, and other associated fees and demobilization upon project completion. This item covers all start up and shut down costs, and will be paid in 2 installments: 60% on the first Application for Payment after mobilization occurs; and 40% on the final Application for Payment. (Lump Sum) 2. Furnish, install, and maintain all temporary erosion and sedimentation control measures as indicated for the duration of the project. Includes but is not limited to: construction entrances w/ curb protection, erosion control blanket in areas of 3:1 or steeper slopes, cofferdam, by-pass pumping, filter bag, rock filter, filter sock, temporary stream crossings, and stockpiling. All temporary erosion control measures shall be removed upon completion of work. Also includes final stabilization of all disturbed areas. (Lump Sum) 3. Perform restoration earthwork, as indicated. Remove and dispose of all excess materials which are excavated or removed as part of the restoration earthwork. Includes: excavating evidenced legacy sediments and removal from site; fill existing incised channel; grading proposed channel system; fill bank installation, and temporary stabilization matting installation. (Lump Sum) 4. Furnish and install log sills, as indicated. Includes: harvesting suitable log sill material onsite and storage of material onsite until needed for installation; excavation of trench suitable for log sill installation; installation of log sills to provide grade control and mitigate the potential for channel incision and floodplain degradation resulting from flooding; choking voids in log sills in order to prevent piping and instability; and backfilling log sills to finished grade. (Lump Sum) 5. Contractor to install woody debris, as indicated. Includes: harvesting and storing materials onsite until needed for installation; over-excavation areas of floodplain to accommodate woody debris placement; install woody debris and backfill. (Lump Sum) 6. Furnish and install Rock Underlayment, as indicated. Includes: over-excavation of areas of floodplain to accommodate riprap placement; furnishing and installing riprap;choking voids with gravel material harvested onsite; furnishing and installing in-place 6" suitable growing medium; furnishing and installing erosion control blanketing to ensure stabilization; and furnishing and installing seed mixture and plants. (Lump Sum) 7. Furnish and install landscaping and plantings, as indicated. Includes: Seeding disturbed areas prior to installing stabilization matting; installation of plant materials, and final stabilization of floodplain disturbance area. (Lump Sum)

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents