Similar Projects
Rice Lake - Spooner Construction / Pavement Replacement
Infrastructure
Design
$25,000,000 CJ est. value
Cameron, WI 54822

RFP Northwood Technical College - Rice Lake Campus 2023
Infrastructure, Build-out
Bidding
$304,000 CJ est. value
Rice Lake, WI 54868

New Auburn - Chetek; Chetek River Bridge B-03-0725, CTH SS
Demolition, New Construction, Infrastructure
Bidding
$1,000,000 CJ est. value
Cameron, WI 54822

Water Quality Trading Clearinghouse
Infrastructure
Post-Bid

Hospital Utility Extension
Infrastructure
Post-Bid
Cumberland, WI

Odden Road and Odden Lane Improvements
Infrastructure
Results
Barronett, WI

Robinson Street and 12th Avenue Water Main Extension
Infrastructure
Results
Cumberland, WI 54829

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

New Aquatic Center - City of Rice Lake
New Construction, Infrastructure
Post-Bid
$7,500,000 CJ est. value
Rice Lake, WI 54868

Water Tower Rehabilitation
Infrastructure
Results
Haugen, WI

Cedarcrest Ambulatory Surger Center and Clinic BP#2
New Construction, Infrastructure
Construction
$3,000,000 CJ est. value
Rice Lake, WI 54868

Turtle Lake Membrane Bio-Reactor - Village of Turtle Lake
Renovation
Post-Bid
$5,700,000 CJ est. value
Turtle Lake, WI 54889

Gravel on 4th Street
Infrastructure
Construction
$70,000 CJ est. value
Vance Creek, WI 54762

Gravel
Infrastructure
Post-Bid
$400,000 CJ est. value
Chetek, WI 54728

Last Updated 01/20/2023 12:40 PM
Project Title

Chetek Wastewater Treatment Facility

Physical Address View project details and contacts
City, State (County) Chetek, WI 54728   (Barron County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development, Storage/Water Tanks, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $19,942,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The project entails the furnishing of all labor and material for the construction of a wastewater treatment facility. Major components of the Work include: main lift station, mile force main, headworks/control building with grit removal, preselected Sequencing Batch Reactor (SBR), aerobic digester, UV/filter building, preselected Continuous Backwash Sand Filter (CBSF), chemical storage building, grit drying bed, site work, lab equipment, electrical/SCADA, HVAC, process piping and demolition of existing wastewater treatment plant. No proposal will be accepted unless accompanied by a certified check or bid bond equal to at least 5% of the amount bid, payable to the Owner as a guarantee that, if the bid is accepted, the bidder will execute and file the proper contract and bond within 15 days after the award of the contract. The certified check or bid bond will be returned to the bidder in accordance with the Instructions to Bidders. The City of Chetek reserves the right to retain the deposits of the three (3) lowest bidders for a period not to exceed 30 days after the date and time set for the opening of bids. No bids may be withdrawn for a period of 30 Days after the date and time set for the opening of bids. Bidders Proof of Responsibility must be submitted in accordance with the Instructions to Bidders. Bidders will be required to provide performance and payment bonds of 100 percent of bid amount. This Contract is expected to be funded in part with funds provided by the United States Department of Agriculture, Rural Utilities Service (RUS). Information on applicable federal requirements is contained in the Project Manual. Section 746 of Title VII of the Consolidated Appropriations Act of 2017 (Division A - Agriculture, Rural Development, Food and Drug Administration, and Related Agencies Appropriations Act, 2017) and subsequent statutes mandating domestic preference applies an American Iron and Steel requirement to this project. All listed iron and steel products used in this project must be produced in the United States. The term iron and steel products means the following products made primarily of iron or steel: lined or unlined pipes and fittings, manhole covers and other municipal castings, hydrants, tanks, flanges, pipe clamps and restraints, valves, structural steel, reinforced precast concrete, and construction materials. The following waivers apply to this Contract: De Minimis, Minor Components, Pig iron and direct reduced iron, and project specific waivers: TBD. The Owner encourages DBEs, MBEs, WBEs, and SBRAs to submit Bid proposals. Equal Opportunity and Affirmative Action requirements apply to this Project. The Offerors or Bidders attention is called to the Equal Opportunity Clause and the Standard Federal Equal Employment Opportunity Construction Contract Specification included in the specifications. The goals and timetables for minority and female participation, expressed in percentage terms for the Contractors aggregate workforce in each trade on all construction work in the covered area, are as follows: Goals for minority participation for each trade = 0.6% (Barron County) Goals for female participation in each trade = 6.9 % The City of Chetek reserves the right to reject any and all bids, without cause, to waive irregularities and informalities therein and to award the Contract in the best interest of the City of Chetek.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Decking, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, Facility Fuel Piping, Facility Fuel-Storage Tanks, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents