Similar Projects
Metropolitan Wastewater Treatment Plant (MWWTP) Services Buildings and Site Improvements - Step 2
Renovation, Infrastructure - 40,000 SF
Bidding
$35,000,000 est. value
Saint Paul, MN 55106

Empire WWTP Solids Improvements Phase II
New Construction
Post-Bid
Farmington, MN 55024

Water Metering House - St. Peter Regional Treatment Facility
New Construction
Post-Bid
$147,643 est. value
Saint Peter, MN 56082

Wastewater Treatment Facility Improvements
Results
$1,800,000 to $2,000,000 est. value
Madelia, MN

2021 Wastewater Treatment Facility Improvements
Addition
Results
$10,000,000 est. value
Melrose, MN

Regional Wastewater Treatment Facility - Contract 1
New Construction
Construction
Oronoco, MN

WLSSD Wastewater Treatment Facility
New Construction
Post-Bid
Duluth, MN

2021 Odor Control Media Procurement
Results
Saint Paul, MN

Wastewater Treatment Facility
Addition
Post-Bid
Caledonia, MN

Wastewater Treatment Facility Improvements
Results
Houston, MN 55943

Hastings WWTP Aeration and HVAC Renewal
Renovation
Post-Bid
Hastings, MN 55033

MWWTP Services Buildings and Site Improvements - Step 1
New Construction
Results
$35,000,000 est. value
MN

Wastewater Treatment Plant
Renovation
Post-Bid
$125,000 est. value
Vernon Center, MN

Wastewater Treatment Facility Scum Removal Improvements
Renovation
Results
Fairmont, MN

Wastewater Treatment Facility Flow Equalization System
New Construction
Post-Bid
$10,000,000 est. value
Crane Lake, MN

Last Updated 05/25/2022 12:23 AM
Project Title

WWTF Upgrade and Expansion

Physical Address View project details and contacts
City, State (County) Owatonna, MN 55060   (Steele County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $12,000,000 to $12,300,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Sitework: Generally includes earthwork, excavation, backfill, dewatering, erosion and sediment control, grading, exterior improvements, utilities, etc. • Main Lift Station (MLS): Includes process piping and valving modifications, HVAC upgrades, and instrumentation and control upgrades. • Fine Screen Building (FSB): Includes construction of new building to house fine drum screen

Details

Sewage Treatment Plant, Addition.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Signage.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents