Similar Projects
A/C Compressor Overhaul Services
Alteration
Bidding
Pasadena, TX

HVAC Replacements for Coleman College
Alteration
Bidding
$975,000 to $1,125,000 est. value
Houston, TX 77030

HVAC Parts and Supplies
Term Contract
Post-Bid
Houston, TX 77064

Air Filter Media
Term Contract
Post-Bid
Deer Park, TX 77536

Replacement and Installation of Heating, Ventilation and Air Conditioning System at the Youth Village
Results
Less than $600,000 est. value
Seabrook, TX 77586

Four (4) Liebert Air Handling Units Replacement at Houston Air Traffic Control Tower (IAH ATCT)
Results
Less than $150,000 est. value
Houston, TX 77032

Air-Handling Units at 1111 Fannin Street for Harris County Facilities and Property Maintenance
Alteration
Bidding
Houston, TX 77002

HVAC Maintenance USCG Air Station Houston
Post-Bid
Houston, TX

HVAC Repairs and Preventative Maintenance of HVAC Systems and Ice Machine
Results
Pearland, TX 77581

HVAC Modification at the North Harris Lone Star College Campus
Post-Bid
Houston, TX 77073

Duct Bank-William P. Hobby Airport
Results
Less than $100,000 est. value
Houston, TX 77061

Heating, Ventilation, and Air Conditioning Services
Term Contract
Post-Bid
Houston, TX 77251

Replacement of HVAC at Ewing Apartments
Results
Less than $151,002 est. value
Houston, TX 77004

ROC Rooftop Unit Replacement
Post-Bid
Houston, TX 77030

Cuney Homes Heater Replacement
Results
Less than $570,606 est. value
Houston, TX 77004

Reported 12/18/2021 12:00 AM
Project Title

Replace Compressor in The Training Room AC

Physical Address View project details and contacts
City, State (County) Houston, TX 77029 (Brazoria, Harris Counties)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Provide labor and material to replace compressor on Training Room AC. Recover refrigerant from system per standards established by the EPA Remove faulty inverter compressor from subject equipment Provide and install (1) new inverter compressor Replace suction sensor Perform evacuation and dehydration of sealed refrigeration system. Perform standing vacuum test on sealed refrigeration system to determine overall integrity; Advise customer of any deficiencies and review necessary corrective actions, if any. Charge system with customer supplied refrigerant. Initiate start-up and check compressor operation. Adjust system charge with customer provided refrigerant to achieve optimal system Performance. Review overall system operation with customer and advise of any necessary repairs or Product improvements, if any.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents