Similar Projects
Moon Golf Club Storage Building - Site Work Construction
New Construction - 5,000 SF
Bidding
Moon Township, PA 15108

Penn Hills Phase XIII 2021 Sewer Repair Contract
Alteration
Bidding
$400,000 to $1,140,000 est. value
Pittsburgh, PA

Penn Hills 2019 CCTV Inspection Contracts - Contract B
Post-Bid
Pittsburgh, PA 15123

Ottawa Hills Sewer Rehabilitation Project
Post-Bid
Pittsburgh, PA 15701

Shacog Joint Municipal Sanitary Sewer Lining Project
Results
Carnegie, PA

Sewer System Pipe Bursting Repairs
Results
Less than $78,500 est. value
West Mifflin, PA 15122

2021 Sanitary Sewer Excavation Repair Contract
Infrastructure
Bidding
Pittsburgh, PA

Penn Hills 2020 CCTV Inspection Contracts
Post-Bid
Penn Hills, PA 15235

Sanitary Sewer Lining Phase 5
Results
Pittsburgh, PA

2021 Sanitary Sewer Rehabilitation Project
Infrastructure
Bidding
Harwick, PA

Wanley Road Sanitary Sewer Rehabilitation Project
Post-Bid
Brentwood, PA 15227

2019 Small Diameter Sewer Rehabilitation (IDIQ)
Results
Pittsburgh, PA 15123

2021 Small Diameter Sewer Rehabilitation - Contract 3
Infrastructure
Bidding
Less than $2,100,000 est. value
Pittsburgh, PA

Manhole-to-Manhole Sewer Lining
Post-Bid
Brentwood, PA 15227

Catch Basin Replacement
Results
Less than $25,000 est. value
Braddock, PA

Last Updated 06/01/2021 08:12 AM
Project Title

Contract #1 – Storm and Sanitary Sewer Repair and Improvements

Physical Address View project details and contacts
City, State (County) Fox Chapel, PA 15238   (Allegheny County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work in this Contract includes: Point repairs of 15” mainline storm sewer, storm inlet pipe purging and cleaning, 4” roadway underdrain point repairs, installation of end caps at all termination points on 4” roadway underdrain, removal and replacement of 8 storm inlet grates, adjustment of risers, grates, and frames on inlets, restore drainage conditions at Yard Drain and construct new berm, repair 2 rip rap aprons, installation of concrete inlet, frame, and grate in detention facility, installation of orifice and weir plates in detention facility, and installation of stormwater diversion berm on Lot 9. Work also includes the installation of a butyl rubber joint and interior spraying to stop infiltration in one of the sanitary sewer manholes. Same manhole will also require the manhole to be raised to existing grade, and the manhole is to be pressure tested after completion of work. Restoration of all disturbed areas to existing or better conditions is required.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents