Similar Projects
Flooring Bid - Clerk's Office
Alteration
Post-Bid
Skowhegan, ME 04976

Fleet - Maintenance Garage Floor Replacement
Alteration
Results
Bangor, ME 04401

Flooring Replacement
Alteration
Results
Presque Isle, ME

Carpet Replacement
Alteration
Post-Bid
$83,000 est. value
Bethel, ME

Public Library Carpet Replacement
Alteration
Results
$29,000 est. value
Lewiston, ME 04240

Apparatus Bay Concrete Floor Coating
Alteration
Results
$400,000 est. value
Kennebunk, ME 04043

Flooring Replacement at Rodick Lorraine Apartments
Renovation
Results
$264,757 CJ est. value
Bar Harbor, ME 04609

Advanced Structures and Composites Center W2 Sloping Floor
Renovation
Post-Bid
$300,000 CJ est. value
Orono, ME 04469

Massabesic High School West Flooring Replacement
Renovation
Results
$122,648 CJ est. value
Waterboro, ME 04087

Flooring Replacement - Inpatient Services, Riverview Psychiatric Center, Augusta, Maine
Renovation
Results
$328,330 CJ est. value
Augusta, ME 04330

UMPI Park Hall - Flooring and Painting
Renovation
Post-Bid
$190,000 CJ est. value
Presque Isle, ME 04769

Flooring and Wall Repair/Replacement Rockport Opera House
Renovation
Sub-Bidding
$200,000 CJ est. value
Rockport, ME 04856

Last Updated 01/31/2023 04:03 PM
Project Title

Gymnasium Floor Leveling - King Middle School

Physical Address View project details and contacts
City, State (County) Portland, ME 04102   (Cumberland County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $41,800 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Summary of Issue: The gymnasium addition floor framing system was constructed without proper support for two wood framed cantilever sections alongside the gymnasium intersection with the main school corridor. As such and over time, the floor system has settled and now slopes in the direction of these two areas. The areas coincide with and are directly beneath the constructed stair access and the man-lift unit between the gymnasium floor and the adjacent school building hallway Remove the stair assembly in its entirety; access the crawl space beneath the gymnasium floor through existing access points and provide a system with which the cantilevered ends of the wood floor can be gradually jacked back to level; provide identified framing support system to the foundation wall beneath the cantilever to maintain level position of the floor framing once jacked to level; reconstruct stairs and finishes to match what was in place prior to removal.

Details

Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents