Project Title | Gymnasium Floor Leveling - King Middle School |
Physical Address | View project details and contacts |
City, State (County) | Portland, ME 04102 (Cumberland County) |
Category(s) | Single Trades |
Sub-Category(s) | Flooring |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected June 2023 |
Bids Due | View project details and contacts |
Estimated Value | $41,800 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Summary of Issue: The gymnasium addition floor framing system was constructed without proper support for two wood framed cantilever sections alongside the gymnasium intersection with the main school corridor. As such and over time, the floor system has settled and now slopes in the direction of these two areas. The areas coincide with and are directly beneath the constructed stair access and the man-lift unit between the gymnasium floor and the adjacent school building hallway Remove the stair assembly in its entirety; access the crawl space beneath the gymnasium floor through existing access points and provide a system with which the cantilevered ends of the wood floor can be gradually jacked back to level; provide identified framing support system to the foundation wall beneath the cantilever to maintain level position of the floor framing once jacked to level; reconstruct stairs and finishes to match what was in place prior to removal. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |