Similar Projects
Building Renovations and Sanitary Sewer Upgrades at Seasonal Housing Facility
Renovation, Alteration - 12,000 SF
Design
Nantucket, MA

Engine 17 Prequalification
Infrastructure
Bidding
$17,754,239 est. value
Boston, MA

Cleaning of the Meadow Road Well
Infrastructure
Bidding
Spencer, MA 01562

Replace One Existing Pump
Post-Bid
$20,000 est. value
Palmer, MA 01069

Furnish and Install a New Pump Bowl Assembly
Post-Bid
Less than $25,000 est. value
Shrewsbury, MA

Church Lane Gravel Packed Well Redevelopment and Pump Repair
Results
Sagamore, MA

Cleaning of Wells 10 and 11
Results
Less than $60,000 est. value
Burlington, MA

Cleaning and Redeveloping of Chestnut Well 3 and Cranberry Well
Post-Bid
Hudson, MA

Return Activated Sludge Pumps and Grit Classifier Replacement
Results
Less than $150,000 est. value
Manchester-By-The-Se, MA 01944

Well 3 and One for Well 4
Post-Bid
$28,000 est. value
Sandwich, MA

Multi Pump Submersible Pitless Pumping System, a New Separate Electric Service
Results
$1,653,000 est. value
Marblehead, MA

Two Irrigation Wells at 115 Cochituate Road and 317 Hollis Street
Post-Bid
Framingham, MA 01701

Replace Sewer Macerators
Results
Ayer, Devens, MA 01434

Private Sector Sump Pump Removal and Sewer System Rehabilitation
Post-Bid
Belmont, MA

Well 3 Redevelopment
Results
Less than $25,000 est. value
Brewster, MA

Last Updated 07/05/2022 08:06 AM
Project Title

Wells 1, 2, And 4R Pfas Treatment - Sub Bids

Physical Address View project details and contacts
City, State (County) North Easton, MA   (Bristol County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $7,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

DCAMM Certificate. Wells 1, 2, and 4R PFAS Treatment. The work under this contract includes but is not limited to: construction of three new buildings at Well Stations 1, 2, and 4R for PFAS treatment equipment; modifications to existing Well Stations 1, 2, and 4R; and associated site work, structural, architectural, process piping, coordination with pressure vessel manufacturer, instrumentation and controls, plumbing, HVAC, and electrical work.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents