Similar Projects
O'Reilly Auto Parts #4033 (SP3)
Renovation - 6,800 SF
Conception
Springfield, MO

O'Reilly Auto Parts #1388 (MLH)
Renovation - 6,800 SF
Conception
Maryland Heights, MO

Sephora
Renovation - 2,500 SF
Design
Kansas City, MO 64155

Club Carwash
New Construction - 5,672 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Independence, Kansas City, MO

Runway 17-35 Reconstruction, Relocate Vehicle Service Outside Object Free Area, Rehabilitate Taxiway D, Install New FAA NAVAID Equipment
Infrastructure
Bidding
$2,000,000 CJ est. value
Saint Joseph, MO 64503

Wastewater Treatment Facility Improvements
Renovation, Infrastructure
Bidding
$200,000 CJ est. value
Oak Grove, AR 72660

Big Shark
Build-out - 4,530 SF
Sub-Bidding
$200,000 CJ est. value
Saint Louis, MO 63110

Food Service Equipment Maintenance
Term Contract
Sub-Bidding
Peculiar, MO 64078

Rue 21 Etc!
Renovation
Post-Bid
Chesterfield, MO

Family Dollar
Renovation
Post-Bid
Hermann, MO

Tub Grinding
Alteration
Results
University City, MO

Rough Site Grading, Parking and Storm Water System Installation
Infrastructure
Results
Columbia, MO

Walmart Supercenter #203-229 - Entertainment Optimization
Renovation - 110,715 SF
Construction
Brookfield, MO 64628

Walmart Supercenter #234-254 - Entertainment Optimization
Renovation - 210,572 SF
Construction
Kansas City, MO 64158

Frontier Justice Commercial Building
New Construction - 27,744 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
O'Fallon, MO 63368

Last Updated 08/12/2022 11:09 AM
Project Title

Nirdosh Gas Station

Physical Address View project details and contacts
City, State (County) Warrenton, MO 63383   (Warren County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Car Wash, Food/Beverage Service, Retail, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $1,500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of August 2022, The final plat was heard by Warrenton Planning Commission August 4, 2022. Information regarding architect or contractor has yet to be determined. Although a firm timeline has yet to be announced, construction is estimated to begin fourth quarter 2022.

Details

1 Story Above Grade, 5,400 SF.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Doors and Frames, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Loading Dock Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Casework, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents