Last Updated 05/19/2020 08:31 AM
Project Title

Water System Improvements Old Alabama Road Utility Relocation - Phase I

Physical Address View project details and contacts
City, State (County) GA   (Bartow County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work consists of furnishing all labor, materials, tools, equipment and incidentals necessary for construction of approximately 5,400 LF of 16-inch DIP water main, 300 LF of 12-inch DIP water main, 700 LF of 8-inch DIP water main, 480 LF 24-inch steel casing (open cut and bored), 240 LF 16-inch steel casing (open cut and bored), 4 fire hydrant assemblies, 1 crossing of Pumpkinvine Creek, all with related valves, connections, fittings, anchors, appurtenances, traffic control, clearing, erosion control, grassing, landscaping, restoration, pavement replacement, clean-up, hydrostatic testing, flushing, and disinfection.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents