Similar Projects
Rhinelander - Eagle River Const / Pavement Replacement
Infrastructure
Conception
$3,000,000 CJ est. value
Rhinelander, WI 54501

Rhinelander - Eagle River Const / Pavement Replacement
Infrastructure
Conception
$3,000,000 CJ est. value
Rhinelander, WI 54501

Rhinelander-Oneida County Airport
Infrastructure
Post-Bid
Rhinelander, WI

Pulverizing and Paving Several Town Streets and Roads
Infrastructure
Post-Bid
Lake Tomahawk, WI

Monico - Eagle River, STH 32 to Vilas County Line
Infrastructure
Results
WI

Rhinelander - Woodruff, Kildeer Road - Vilas County Line
Infrastructure
Results
WI

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Minocqua - Manitowish
Infrastructure
Conception
$2,000,000 CJ est. value
Rhinelander, WI 54501

Contract A - 2022 Road Improvements
Infrastructure
Post-Bid
Three Lakes, WI

Crandon - Three Lakes, Culvert Replacements; Crandon - Three Lakes, Hiles Culvert Replacements
Infrastructure
Results

Contract B - 2022 Road Improvements
Infrastructure
Post-Bid
$300,000 est. value
Three Lakes, WI

Lakewood Rd Culvert Replacement - Bearskin Creek
Alteration
Results
WI

River Road Improvements
Infrastructure
Post-Bid
$376,000 est. value
Rhinelander, WI 54501

Hancock Lake Dam Culvert Replacement
Infrastructure
Results
Harshaw, WI

Last Updated 07/08/2023 06:32 AM
Project Title

Remove the Existing Pavement and Remove Existing Culvert and Replace

Physical Address View project details and contacts
City, State (County) Pelican, WI 54501   (Oneida County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $99,075 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Located on Wildflower Bay Rd starting approximately 300' south of Luke Julia Rd and going south for 257 LF. Project includes the following: Remove the existing pavement (Milling is acceptable) Remove existing culvert and replace with a 38' x 15" Double Wall HDPE Culvert Excavate 12", place geo-grid, and place 12" stone in areas that measure 75' x 20' and 110' x 16' Fine grade and compact the base to promote positive drainage. Pave 20' wide on ends and widen to 24' wide in the corner. Pavement thickness to be 2.25" with a 4 LT 58-28S Mix Type Place 2' wide shoulder on each side of the road The Town has the right to accept or reject any or all bids. For further information and bid specifications, please contact Road Supervisor, Mike Carroll, at 715-360-0493 Mike Ring, Clerk Town of Pelican 4095 Pine Ln Rhinelander WI 54501 Bid Results : Faust Lake Road : American Asphalt - $58,825.00 Wildflowers Bay and Pelican Ranch Roads : American Asphalt - $40,250.00

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents