Similar Projects
Annual Agreement For Wastewater Pump Station Repair And Renovation
Term Contract
Post-Bid
FL

SHIP Program Well and Septic Installation
Post-Bid
Macclenny, FL 32063

Replace Chiller and Pumps at USCG Sector Key West, Florida
Results
$250,000 to $500,000 est. value
Big Coppitt Key, FL 33040

Repair Services for Pumps, Motors, and Other Equipment
Results
Kissimmee, FL 34741

Irrigation Well Replacement
Term Contract
Post-Bid
Land O' Lakes, FL 34639

FB Potable Water Well 14
Results
Less than $264,480 est. value
Flagler Beach, FL 32135

Well Pump Motor
Post-Bid
Plant City, FL 33564

New Condenser Water Return Well No.2
Term Contract
Results
Tallahassee, FL 32307

Well Pump Diagnostic for Irrigation System NRCS FL
Post-Bid
Brooksville, FL 34601

Live Oak Drainage Wells Phase 1
Results
Less than $400,000 est. value
Live Oak, FL

Centrifugal Dewatering 12" x 8" Self-Priming Pumps - Trailer Mounted
Post-Bid
FL

DX38 Dynamometer Pump and Motor Replacement Coast Guard Engineering
Results
$45,000 est. value
Miami Beach, FL 33139

Wet Well Cleaning
Post-Bid
North Port, FL

Eldridge-Wilde Wellfield Pumps and Motors Replacement Project and the Cypress Trails Property Improvements Project
Results
Odessa, FL 33556

Well Testing, Drilling And Maintenance
Demolition, Term Contract
Post-Bid
FL

Last Updated 03/03/2022 11:38 AM
Project Title

Lower Floridan Aquifer Production Well

Physical Address View project details and contacts
City, State (County) Mascotte, FL   (Lake County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction, development, testing and logging of two new 12-inch Lower Floridan aquifer production wells and all materials and equipment, services and construction inherent to the Work.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents