Similar Projects
Last Updated | 12/08/2022 03:38 AM |
Project Title | REBID Convert Steam System to Low Pressure |
Physical Address | View project details and contacts |
City, State (County) | Minneapolis, MN 55417 (Hennepin County) |
Category(s) | Residential |
Sub-Category(s) | Assisted Living Facility |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected November 2022 |
Bids Due | View project details and contacts |
Estimated Value | $1,482,500 [brand] Estimate |
Plans Available from | Mechanical Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | State Project Number 75MP0095 REBID Convert Steam System to Low Pressure at Minnesota Veterans Home - Minneapolis This project is Targeted Group/Economically Disadvantaged/Veteran-Owned preference.> A. The work will done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. 1.) Submit shop drawings. 2.) Order any materials required for project completion. 3.) Provide schedule of work identified by steam tunnel. 4.) Provide schedule of work to be performed on Power Plant. 5.) Schedule modifications to high pressure steam boilers. 6.) Project closeout Est. Completion Date: Aug. 30, 2023 The Section 00 41 73 Prime Contractor Response Form (Response Form), which includes the attachments listed in the project manual table of contents, is posted within the VirtuBid area of the electronically Plan Room. The Response Form must be downloaded, completed, and uploaded with the bid before it can be posted. This solicitation includes qualification requirements. Attachment C of the Response Form contains the qualification requirements for the solicitation. Qualification requirements include, but are not limited to: Responding company has completed as a Prime Contractor or as a Subcontractor, the work for at least 3 contracts which have achieved Substantial Completion since August 2017 for construction of modification/installation of steam boilers and/or associated steam piping. Each of these contracts MUST have had a construction value of $300,000 or greater. OR In lieu of Responding company's projects, Responder may provide on the form below up to 3 qualifying projects completed by the Project Manager while employed by others which have achieved Substantial Completion August 2017 for modification/installation of steam boilers and/or associated steam piping, and $300,000 or greater. To view the Attachment C Qualification Form where the information above is located, as well as additional qualification requirements, go to the VirtuBid area of the electronically plan room for this project and download the Response Form. All applicable attachments in the Response Form must be completed and uploaded before a bid can be posted in the electronically plan room. |
||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |