Similar Projects
Kitchen Hood Service
Post-Bid
Fort Hood, TX

J--Furnish and Install New Metasys Bas Tec Programmable Controllers 674-20-1-5065-0110
Post-Bid
Temple, TX 76504

Replace Two Chiller Circuites for a Building
Results
$250,000 to $500,000 est. value
Killeen, TX 76544

Replace HVAC at Building
Results
$500,000 to $1,000,000 est. value
Fort Hood, TX 76544

41--JMITS Test Van Air Conditioner Replacement Units
Post-Bid
Fort Hood, TX

41--CTX Mobile Chiller Unit
Results
Temple, TX 76504

4510--Cooling Tower Water Treatment Stations
Post-Bid
Temple, TX 76504

Replace Chillers Building 56059
Results
$100,000 to $250,000 est. value
Fort Hood, TX 76544

HVAC Services, Supplies and Equipment
Post-Bid
$50,000 to $150,000 est. value
Belton, TX 76513

J041--New-Temple AHU 7 CHW Pump & Bypass (VA-19-00102647)
Results
Temple, TX 76504

Installation of Bathroom Ventilation Fans at Belton Housing Authority
Post-Bid
Belton, TX 76513

Replace HVAC Systems Building 70020
Results
$500,000 to $1,000,000 est. value
Fort Hood, TX 76544

6515--Nucmed Fume Hood
Post-Bid
Temple, TX

Replace Chillers in Building 56055
Results
$100,000 to $250,000 est. value
Fort Hood, TX 76544

Suppliers of Daikin/Mcquay HVAC Chiller Units
Post-Bid
Fort Hood, TX

Last Updated 02/04/2021 07:26 AM
Project Title

Replace HVAC Units Building 7050

Physical Address View project details and contacts
City, State (County) Fort Hood, TX   (Bell County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Pre-Solicitation
Bids Due View project details and contacts
Estimated Value $500,000 to $1,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The purpose of this project is to upgrade the chilled-water system at building 7050 and replace nine existing air handlers. The existing system consists of two water-cooled chillers, two cooling towers, and five pumps, which shall be replaced with one air-cooled chiller and two pumps. Work shall also include replacing several existing piping accessories, balancing existing air devices, and modifying existing HVAC controls.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents