Similar Projects
Traffic Signs
Infrastructure
Sub-Bidding
$250,000 CJ est. value
Melbourne, IA 50162

Traffic Signs
Infrastructure
Sub-Bidding
$80,000 CJ est. value
Davenport, IA 52806

Camp Dodge S-52 HVAC and Lighting Upgrades
Alteration
Post-Bid
Johnston, IA

University of Northern Iowa ITC - Request for Qualifications For Mechanical & Electrical Contractors
Renovation, Addition, Alteration - 87,197 SF
Post-Bid
Cedar Falls, IA

Transmission Modifications
Infrastructure
Results
$590,000 est. value
Ames, IA 50010

Davenport AASF Generator Addition
Alteration
Results
Davenport, IA 52806

Miscellaneous
Infrastructure
Sub-Bidding
$500,000 CJ est. value
Sioux City, IA 51054

Electric Vehicle Charging Station Installation
Term Contract
Post-Bid
Less than $25,000 est. value
Ames, IA 50010

Furnishing Generator Control Panels
Alteration
Results
Less than $288,600 est. value
Winterset, IA

Install Runway 17/35 Edge Lighting
Infrastructure
Sub-Bidding
$400,000 CJ est. value
Storm Lake, IA 50588

Miscellaneous Electric Supplies
Alteration
Post-Bid
Ames, IA

2021 HS Auditorium Audio Visual Improvements - Electrical
Alteration
Results
Des Moines, IA

Furnishing 15 kV Outdoor Sheltered Aisle Switchgear
Renovation
Sub-Bidding
$500,000 CJ est. value
Paullina, IA 51046

2022 Roof Replacement at Gaylord Smith Building
Alteration
Post-Bid
Sioux City, IA 51106

Replacement Radiator for Generator Engine
Alteration
Results
Davenport, IA

Last Updated 03/15/2023 11:32 PM
Project Title

Bondurant-Farrar CSD High School Controls Replacement

Physical Address View project details and contacts
City, State (County) Bondurant, IA 50035   (Polk County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $153,980 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

ForBondurant-Farrar CSD High School Controls Replacement DESCRIPTION OF PROJECT A. Upgrade the existing Alerton Controls as summarized in Specification Section 23 0993-1.03.B. COMPLETION DATE A. Thursday, June 29, 2023. BID SECURITY A. 5% CONTRACTS A. Prime Contract

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents