Similar Projects
Platform Rehabilitation Program Contract 4
Renovation
Bidding
Washington, DC - Washington, PA 20001

Creedmore Bridge Repair Project
Bidding
Cecil, PA

Park Bridge Replacements
Post-Bid
Cecil, PA 15321

Request for Quotation - Materials Wheeling & Lake Erie Railway
Renovation
Post-Bid

Replacement Bridge (20Ft X 16Ft) for Hickman Road
Results
PA

Bridge Rehabilitation and Pavement Repairs
Results
PA

Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Bidding

Airport Road and Mulberry Hill Bridge Repair Projects
Post-Bid
Washington, PA 15301

SR 1059 over Mingo Creek
Results
$500,000 to $999,999 est. value
PA

Berthel Avenue Bridge Scour Repair
Results
Washington, PA 15301

Bridge Scour Repair
Results
$100,000 to $500,000 est. value

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

East Hillis Street
Results
$1,000,000 to $2,499,999 est. value
PA

PA 366 BR Over Pucketa Ck
Results
$1,000,000 to $2,499,999 est. value
PA

Bridge over NS RR
Results
$1,000,000 to $2,499,999 est. value
PA

Last Updated 08/21/2020 02:41 AM
Project Title

On Demand Bridges 12-0

Physical Address View project details and contacts
City, State (County) (Fayette, Greene, Washington, Westmoreland Counties)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000 to $2,499,999
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The description and location of the project is as follows. Bridge on-demand maintenance of various structure types including but not limited to structural steel repairs, concrete deck repairs, concrete substructure repairs, bearing repairs, and scour countermeasures along with other miscellaneous construction, as indicated on the attached details included in the bid package for Various State Routes, In Various Municipalities, In Fayette, Greene, Washington, And Westmoreland Counties. 0204-0100 Cubic Yard 520.000 01** n c1, s1, t1 Class 3 Excavation 0205-0292 Cubic Yard 50.000 01** n c1, s4 Structure Backfill 4205-0381 Ton 200.000 01** n Yes c1 Proj Selected Borrow Excavation, Coarse Aggregate, No. 1 , Delivery Included 4205-0385 Ton 200.000 01** n Yes c1 Proj Selected Borrow Excavation, Coarse Aggregate, No. 57 , Delivery Included 4205-0388 Ton 50.000 01** n Yes c1 Proj Selected Borrow Excavation, Coarse Aggregate, No. 8 , Delivery Included 4205-0390 Ton 600.000 01** n Yes c1 Proj Selected Borrow Excavation, Coarse Aggregate, No. 2a , Delivery Included 4212-0014 Square Yard 1,000.000 01** n Yes c3, h, m2 Proj Geotextile, Class 4, Type a , Delivery Included 0460-0004 Gallon 40.000 01** n f4 Bituminous Tack Coat (Ntt/Cntt) 0609-0003 Lump Sum 1.000 01** n x Inspector`s Field Office And Inspection Facilities, Type b 0609-0009 Lump Sum 1.000 01** n x Std Equipment Package 0620-0500 Linear Foot 300.000 02** n j Reset Guide Rail 4626-0001 Cubic Yard 60.000 01** n Yes m2 Proj Gabions, Type a Delivery Included 0845-0001 Dollar 6,300.000 $1.00 $6,300.00 01** y c1, h, m2 Unforeseen Water Pollution Control 5001-1000 Cubic Yard 100.000 01** n Yes s9 Proj Class Aaap Cement Concrete Delivery Included 5001-1060 Cubic Yard 100.000 01** n Yes s9 Proj Class Aaa Cement Concrete Delivery Included 5001-1080 Cubic Yard 100.000 01** n Yes s2 Proj Class Aa Cement Concrete Delivery Included 5001-1120 Cubic Yard 100.000 01** n Yes s2 Proj Class a Cement Concrete Delivery Included 5001-1140 Cubic Yard 70.000 01** n Yes k Proj Class c Cement Concrete Delivery Included 5001-1160 Cubic Yard 30.000 01** n Yes s2 Proj Class Hes Cement Concrete Delivery Included 5040-0002 Square Foot 600.000 01** n Yes s9 Proj Concrete Bridge Deck Repair, Type 2 Includes Delivery, Testing, And Curing Materials 5040-0003 Square Foot 200.000 01** n Yes s9 Proj Concrete Bridge Deck Repair, Type 3 Includes, Delivery, Testing, And Curing Materials 9000-0001 Hour 200.000 01** n c1 Proj Hi-Lift, Rubber Tire Or Crawler Tractor, Size As Directed 9000-0002 Hour 680.000 01** n c1 Proj Tri-Axle Truck, 10 Cy 9000-0003 Hour 200.000 01** n s2 Proj Pick-Up Truck, 3/4 Ton 9000-0004 Hour 200.000 01** n s2 Proj Compressor, Size As Directed With Minimum 300` Airhose, 3/4" And Minimum Of Two 15 - 90 Lb Pnuematic Hammers As Directed 9000-0005 Hour 600.000 01** n s2 Proj Hydraulic Excavator, Truck Or Crawler Mounted, Up To And Including a 160 (Up To 20,000 Lbs), Bucket And Attachments 9000-0006 Hour 600.000 01** n s2 Proj Hydraulic Excavator, Truck Or Crawler Mounted, Up To And Including a 350 (20,000 To 100,000 Lbs), Bucket And Attachments 9000-0007 Hour 85.000 01** n c1 Proj Loader Backhoe, Rubber Tire, Size As Directed 9000-0008 Hour 600.000 01** n c1 Proj Single Axle Dump Truck 5 Cy Capacity 9000-0009 Hour 100.000 01** n c1 Proj Tandem Axle Flatbed Truck 9000-0010 Hour 680.000 01** n s2 Proj Miscellaneous Power Tools 9000-0011 Hour 100.000 01** n s2 Proj Weld Truck 9000-0012 Hour 60.000 01** n s7 Proj Flusher/Vacuum Truck 9000-0013 Hour 100.000 01** n s2 Proj Skid Steer Loader, Size As Directed 9000-0014 Hour 60.000 01** n s2 Proj Vertical Reach Manlift, Size As Directed 9000-0015 Hour 200.000 01** n s2 Proj Hydraulic Excavator, Truck Or Crawler Mounted, Over a 350 (Over 100,000 Lbs), Bucket And Attachments 9000-0016 Hour 35.000 01** n s2 Proj 60` Reach Under Bridge Snooper Crane 9000-0017 Hour 16.000 01** n s2 Proj 30 Ton, 80` Reach Crane 9000-0018 Hour 16.000 01** n s2 Proj 50 Ton, 80` Reach Crane 9000-0019 Hour 16.000 01** n s2 Proj Concrete Pump 3" Line With Minimum 150` Of Line 9000-0020 Hour 16.000 01** n s2 Proj 1/2 Cy Portable Concrete Mixer 9000-0021 Hour 200.000 01** n s2 Proj 5000 Watt Generator With Small Hand Tools 9000-0023 Dollar 8,400.000 $1.00 $8,400.00 01** y c1, h, m2 Proj Temporary Water Diversion 9000-0029 Dollar 400,000.000 $1.00 $400,000.00 01** y s2 Proj Unforeseen Equipment, Labor And Materials 9000-0031 Hour 32.000 01** n c1 Proj Hi-Lift, Rubber Tire Or Crawler Tractor - Standby, Size As Directed 9000-0032 Hour 32.000 01** n c1 Proj Tri-Axle Truck, 10 Cy Standby 9000-0033 Hour 40.000 01** n s2 Proj Pick-Up Truck, 3/4 Ton, Standby 9000-0034 Hour 240.000 01** n c1 Proj Hydraulic Excavator, Truck Or Crawler Mounted, Over a 350 (Over 100,000 Lbs), Bucket And Attachments - Standby 9000-0035 Hour 240.000 01** n c1 Proj Hydraulic Excavator, Truck Or Crawler Mounted, Up To And Including a 160 (Up To 20,000 Lbs), Bucket And Attachments - Standby 9000-0036 Hour 240.000 01** n c1 Proj Hydraulic Excavator, Truck Or Crawler Mounted, Up To And Including a 350 (20,000 To 100,000 Lbs), Bucket And Attachments - Standby 9000-0037 Hour 24.000 01** n c1 Proj Loader Backhoe, Rubber Tire, Size As Directed - Standby 9000-0038 Hour 40.000 01** n c1 Proj Single Axle Dump Truck, 5 Cy Capacity - Standby 9000-0039 Hour 40.000 01** n s2 Proj Tandem Axle Flatbed Truck - Standby 9000-0040 Hour 240.000 01** n s2 Proj Compressor, Size As Directed With Minimum 30` Airhose, 3/4" And Minimum Of Two 15 - 90 Lb Pnuematic Hammers As Directed - Standby 9000-0041 Hour 16.000 01** n s2 Proj Weld Truck, Standby 9000-0042 Hour 16.000 01** n s2 Proj Flusher/Vacuum Truck, Standby 9000-0043 Hour 64.000 01** n s2 Proj Skid Steer Loader, Size As Directed, Standby 9000-0044 Hour 20.000 01** n s2 Proj Vertical Reach Manlift, Size As Directed - Standby 9000-0046 Hour 12.000 01** n s2 Proj 60` Reach Under Bridge Snooper Crane, Standby 9000-0047 Hour 12.000 01** n s2 Proj 30 Ton, 80` Reach Crane, Standby 9000-0048 Hour 12.000 01** n s2 Proj 50 Ton, 80` Reach Crane, Standby 9000-0049 Hour 12.000 01** n s2 Proj Concrete Pump 3" Line With Minimum 150` Of Line, Standby 9000-0050 Hour 12.000 01** n s2 Proj 1/2 Cy Portable Concrete Mixer, Standby 9000-0051 Hour 32.000 01** n s2 Proj 5000 Watt Generator With Small Hand Tools, Standby 9000-0052 Hour 128.000 01** n s2 Proj 3" Water Pump 9000-0053 Hour 128.000 01** n s2 Proj 6” Water Pump 9000-0054 Hour 96.000 01** n c Proj Compaction Equipment 9000-0055 Hour 16.000 01** n s2 Proj Magnetic Drill 9000-0056 Ton 200.000 01** n c1 Proj Rock, Class r-3, Delivery Included 9000-0057 Ton 200.000 01** n c1 Proj Rock, Class r-4, Delivery Included 9000-0058 Ton 200.000 01** n c1 Proj Rock, Class r-5, Delivery Included 9000-0059 Ton 200.000 01** n c1 Proj Rock, Class r-6, Delivery Included 9000-0060 Ton 200.000 01** n c1 Proj Rock, Class r-7, Delivery Included 9000-0061 Ton 200.000 01** n c1 Proj Rock, Class r-8, Delivery Included 9000-0070 Hour 5,500.000 01** n s2 Proj Laborer - Regular Time 9000-0071 Hour 320.000 01** n s2 Proj Laborer - Premium Time 9000-0072 Hour 1,200.000 01** n s2 Proj Foreman - Regular Time 9000-0073 Hour 32.000 01** n s2 Proj Foreman - Premium Time 9000-0074 Hour 1,500.000 01** n s2 Proj Carpenter - Regular Time 9000-0075 Hour 40.000 01** n s2 Proj Carpenter - Premium Time 9000-0076 Hour 120.000 01** n s Proj Cement Finisher - Regular Time 9000-0077 Hour 16.000 01** n s2 Proj Cement Finisher - Premium Time 9000-0078 Hour 164.000 01** n s2 Proj Welder - Regular Time 9000-0079 Hour 16.000 01** n s2 Proj Welder - Premium Time 9000-0080 Hour 80.000 01** n s2 Proj Iron Worker - Regular Time 9000-0081 Hour 8.000 01** n s2 Proj Iron Worker - Premium Time 9000-0082 Hour 40.000 01** n s2 Proj Engineer - Regular Time 9000-0083 Hour 250.000 02** n q Proj Flagger - Regular Time 9000-0084 Hour 40.000 02** n q Proj Flagger - Premium Time 9000-0085 Hour 1,000.000 01** n c, c1, s2, t1, t3 Proj Heavy Equipment Operator - Regular Time 9000-0086 Hour 24.000 01** n c, c1, s2, t1, t3 Proj Heavy Equipment Operator - Premium Time 9000-0094 Hour 64.000 02** n q Proj Shadow Vehicle 9000-0095 Day 24.000 02** n p8, q Proj Portable Three Line Changeable Message Sign 9000-0096 Dollar 16,000.000 $1.00 $16,000.00 02** y q Proj Required Traffic Control Signs And Devices 9000-0097 Square Foot 500.000 02** n q Proj Additional Traffic Control Signs 9000-0098 Dollar 16,000.000 $1.00 $16,000.00 02** y q Proj Unforeseen Traffic Control 9000-0099 Hour 40.000 02** n q Proj Portable Light Plant 9000-0100 Dollar 12,500.000 $1.00 $12,500.00 02** y x Proj Railroad Involvement 9000-0101 Linear Foot 400.000 01** n c1, s5 Proj Temporary Excavation Support And Protection System 9000-0102 Each 20.000 01** n q Proj Installation And Removal Temporary Steel Roadway Plate

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents