Similar Projects
Filtered Water Bottle Filling Stations
Alteration
Bidding
$100,000 est. value
Fitchburg, MA 01420

Mckay Steam Valves Replacement
Post-Bid
$19,000 est. value
Fitchburg, MA 01420

HVAC Chiller Elementary School
Alteration
Post-Bid
Sutton, MA 01590

New Mechanical Installation for Building B Addition
Results
$200,000 est. value
Worcester, MA

Oil Burner Service and/or Boiler Cleaning Service
Results
$55,000 est. value
Jefferson, MA

Emergency and Non-Emergency Repair Service and On-Call Mechanical and Facilities Repair
Alteration
Post-Bid
$200,000 est. value
Milford, MA

Electric Hot Water Heater Replacement
Results
$38,000 est. value
Athol, MA 01331

Boiler Replacement, Nipmuc Regional High School - General Bids
Alteration
Post-Bid
$1,106,437 est. value
Upton, MA 01568

Heating Boiler Replacement Ghosh Science and Technology Center
Results
$649,820 est. value
Worcester, MA 01602

Machine Shop At Conley Terminal
Alteration
Post-Bid
Boston, MA 02127

Delivery and Installation of Electrical, Mechanical
Alteration
Results
$40,000 to $60,000 est. value
Whitinsville, MA

Basic Wing Mechanical Infrastructure
Alteration
Post-Bid
$225,000 est. value
Worcester, MA

Plumbing, Heating, and Mechanical Services
Term Contract, Alteration
Results
$130,000 est. value
Westborough, MA

Kitchen Rehab and Replace Hot Water Heater - General Bid
Alteration
Post-Bid
$408,000 est. value
Westborough, MA 01581

Boiler Condensate System Repairs, Administration Building
Alteration
Results
$49,700 est. value
Worcester, MA 01606

Last Updated 06/21/2022 11:53 AM
Project Title

Heating/DHW System Improvements, Griffin Apartments - General Bid

Physical Address View project details and contacts
City, State (County) Hopedale, MA 01747   (Worcester County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $235,000
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Replacement of existing heating/DHW boiler system with improved reliable systems at Griffin Apartments. This project also includes providing new isolation valves and drains with the building crawlspaces for testing the underground piping to determine a potential leaking section.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Heating Boilers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents