Similar Projects
Contractor - Replace AHU/Return/VAV, 1739, CCSFS
Alteration
Design
$100,000 to $250,000 est. value
Cape Canaveral, FL

Cooling Tower Replacement at Cancer/Genetics
Renovation
Sub-Bidding
$447,700 CJ est. value
Gainesville, FL 32610

Chiller System Replacement Toll Plaza
Renovation
Sub-Bidding
$550,000 CJ est. value
Tampa, FL 33607

15-Ton A/C System Replacement
Alteration
Post-Bid
$50,000 est. value
Yulee, FL 32097

City Hall and Recreation HVAC Design Re-Build
Alteration
Post-Bid
$500,000 est. value
Tavares, FL 32778

Pre-Conditioned Air Units
Term Contract
Results
Fort Lauderdale, FL 33315

HVAC System Replacement - Snyder RC
Alteration
Results
$140,000 to $160,000 est. value
Jacksonville, FL 32221

Kendall Campus Building L Chiller Replacement
Renovation
Pending Verification
$500,000 CJ est. value
Miami, FL 33176

Pembroke Pines Parks - HVAC Replacement
Renovation
Sub-Bidding
$200,000 CJ est. value
Pembroke Pines, FL 33026

AC Installation
Alteration
Post-Bid
$13,000,000 est. value
Melbourne, FL

Countywide HVAC Preventative Maintenance and Minor Repair Services
Term Contract, Alteration
Results
$572,642 est. value
FL

Lake County Fire Station 14 HVAC Renovation
Renovation
Sub-Bidding
$165,069 CJ est. value
Altoona, FL 32702

Coral Shores High School Pod AC Renovations
Alteration
Post-Bid
$200,000 est. value
Tavernier, FL 33070

Air Conditioner Replacement at Bay Oaks Recreational Campus
Alteration
Results
Fort Myers Beach, FL 33931

MNA Supply and Install 10 Ton HVAC FY 2024
Renovation
Sub-Bidding
$100,000 CJ est. value
Marianna, FL 32446

Last Updated 09/29/2023 03:04 AM
Project Title

Hvac Replacement at Boys and Girls Club

Physical Address View project details and contacts
City, State (County) Avon Park, FL 33825   (Highlands County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $1,386,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

M/WBE's are encouraged to participate in the bid process. The City of Avon Park is seeking proposals, from qualified HVAC Contractors that have been in business at least five (5) years, to provide all necessary labor and material to remove and replace Air Conditioning equipment at the Avon Park Boys and Girls Club located at 207 State Street in Avon Park, FL 33825. The equipment to be replaced will include the following: 27.2 Two (2) 15-ton Air Handling Units that are located above the gym. These units will be 6,000 CFM Single Zone Air Handling Units, Built-Up, Constant Volume, Horizontal/Vertical, with Drawthrough Fans. 27.3 Four (4) 7.5-ton Air-Cooled Condensing Units with Compressor, Condenser, Fan and Motor. These units will be for the AHU's above the gym. 27.4 One (1) 1,200 CFM Single Zone Air Handling Unit, Built-Up, Constant Volume, Horizontal/Vertical, with Draw-through Fan. This unit will be for the classrooms. 27.5 One (1) 3-ton 14 SEER, Air-Cooled Condensing Unit, Pre-Charged with refrigerant capable of charging the system with a 20' length of piping. This unit will be for the classrooms' AHU. 27.6 One (1) 1,600 CFM Single Zone Air Handling Unit, Built-Up, Constant Volume, Horizontal/Vertical, with Draw-through fan. This unit will be for the office and entry area. 27.7 One (1) 4-ton, 14 SEER, Air-Cooled Condensing Unit, Pre-Charged with refrigerant capable of charging the system with a 20' length of piping. This unit will be for the office and entry area's AHU. 27.8 One (1) 2,000 CFM Single Zone Air Handling Unit, Built-Up, Constant Volume, Horizontal/Vertical, with Draw-through Fan. This Unit will be for the field house behind the main building. 27.9 One (1) 5-ton 14 SEER, Air-Cooled Condensing Unit, Pre-Charged with refrigerant capable of charging the system with a 20' length of piping. This unit will be for the field house's AHU. 27.10 Copper fittings and pipe will be used for all replacement Question Deadline 10/18/2023 at 4:00 PM ET

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents