Similar Projects
Last Updated | 03/23/2023 07:34 AM |
Project Title | Hoods and Ducts Fire Suppression Maintenance - Offutt AFB |
Physical Address | View project details and contacts |
City, State (County) | Offutt AFB, NE 68113 (Sarpy County) |
Category(s) | Government/Public |
Sub-Category(s) | Military Facility |
Contracting Method | Competitive Bids |
Project Status | Construction start expected June 2023 , Construction documents |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Major Items of Work. 1.1 Fire Suppression Systems. 1.1.1 Inspections: The Contractor shall perform semi-annual inspections for the Kitchen Fire Suppression Systems listed in Table 2 in accordance with the most current editions of National Fire Protection Association (NFPA) 17A Standard for Wet Chemical Extinguishing Systems, NFPA 96 Standard for Ventilation Control and Fire Protection of Commercial Cooking Operations and Uniform Fire Code (UFC) 3-601-02 Fire Protection Systems Inspection, Testing, And Maintenance. The Contractor shall immediately inform the Contracting Officer's Representative (COR) in writing of any system deficiency which would deem any Fire Suppression Systems out of service per NFPA 17A, NFPA 96 or UFC 3-601-02. 1.1.2 Required/Corrective Maintenance: The Contractor shall provide and replace fusible links and nozzle covers required to keep systems to optimum working conditions at the time of the inspections at no cost to the Government. At a minimum, the Contractor shall perform tasks listed in Table 1 below. The COR or the Contracting Officer (CO) will notify the Contractor of repairs to be made from the inspection reports or customer service calls. The Contractor shall report to the work location, survey the repair, and provide the COR and CO an estimated cost of repair. The estimate must include all parts with part numbers listed individually, labor, including costs for all electrical repairs, overhead & profit and all other incurred cost broken down individually. The Contractor shall commence repair work within 72 hours after notification from the CO or authorized representative to proceed. The method of contractor selection has not been determined at this time. |
||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |