Similar Projects
Crescent Harbor Elementary School
New Construction
Conception
$68,000,000 est. value
Oak Harbor, WA 98277

Oak Harbor Elementary School
New Construction
Conception
$75,000,000 est. value
Oak Harbor, WA 98277

New Transition Services Educational Facility
New Construction - 20,000 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Bellevue, WA

High School Addition
New Construction, Addition - 15,000 SF
Design
Ridgefield, WA

Renton High School Science Classrooms Modernization Project
Renovation
Bidding
Renton, WA 98057

Design Build Service Bryant Montessori K 8 School Replacement
New Construction
Bidding
$31,500,000 est. value
Tacoma, WA

Chinook Elementary School Replacement
Renovation
Sub-Bidding
Vancouver, WA 98685

ESD 112 Mental Health Center
Renovation
Post-Bid
$1,800,000 est. value
Vancouver, WA 98661

Lincoln HS Retaining Wall and Entrance Repairs
Renovation
Post-Bid
Less than $100,000 est. value
Tacoma, WA 98418

Disaster Recovery Services
Results

Disaster Recovery Services
Results

Sunnyland Elementary School
Renovation, Addition
Pending Verification
Bellingham, WA 98225

Othello High School
New Construction, Renovation, Addition
Pending Verification
Othello, WA 99344

Olympic Valley Elementary School
New Construction
Conception
$67,000,000 est. value
Oak Harbor, WA 98277

Arletta Schoolhouse Renovation
Renovation
Bidding
Gig Harbor, WA 98335

Last Updated 01/11/2022 12:10 PM
Project Title

Design Build Services for Memorial Field Renovation

Physical Address View project details and contacts
City, State (County) Federal Way, WA   (King County)
Category(s) Education
Sub-Category(s) Elementary School, Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Memorial Field Renovation Project is located in Federal Way, Washington. The project will increase spectator capacity replacing two existing grandstands and swap the location of the home and visitor grandstand to better accommodate operations for athletics and other District and community events. The track and field will be resurfaced and updated to current standards and support structures such as bathrooms, concessions, and ticketing will be reorganized and replaced. Site improvements will include landscaping, parking, utility connections and frontage improvement as required by the City of Federal Way. Other improvements include lighting, technology, and security infrastructure as well as interior finishes of the locker rooms and stadium offices located in the existing surplus warehouse at the south entrance of the field.

Details

Elementary School, Renovation, Middle/Senior High School, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents