Similar Projects
RFQ Design - Industrial Park East Railcar Storage Yard
Infrastructure
Conception
$140,000 CJ est. value
Lake Charles, LA 70601

RFQ Engineering - New Warehouse at City Docks
New Construction, Infrastructure
Conception
$500,000 CJ est. value
Lake Charles, LA 70601

LA 931 at Roddy Rd. and Joe Sevario Rd.
Infrastructure
Design
$2,500,000 CJ est. value
Gonzales, LA 70737

I-10: Calcasieu River Bridge Int Repairs
Infrastructure
Design
$5,000,000 CJ est. value
Sulphur, LA 70665

LA 30 Roundabouts at Tanger Mall and I-10
Infrastructure
Bidding
$30,000,000 CJ est. value
Gonzales, LA 70737

Water System Expansion
Infrastructure
Bidding
$690,000 CJ est. value
Iota, LA 70543

Prairieville High School Site Improvement Project
Infrastructure
Post-Bid
Prairieville, LA 70769

Port Improvements to Elevated Water Storage Tank Repairs
Infrastructure
Post-Bid
$240,000 est. value
Lake Charles, LA

Cathodic Protection Survey
Term Contract
Results
Barksdale AFB, LA 71110

Magnolia Chase Force Main and Lift Station Improvements
Renovation, Infrastructure
Results
Benton, LA

Preston Crownover Artificial Turf Field
Infrastructure
Construction
$1,168,700 CJ est. value
Bossier City, LA 71112

Shell Chemical Geismar Plant Expansion
Addition, Demolition, Renovation, Infrastructure
Pending Verification
$1,200,000,000 CJ est. value
Geismar, LA 70734

Pelican Pointe Apartments
Addition, Demolition, Renovation, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Benton, LA 71006

Central Parkway - East and West - Asphalt Overlay Project - City of Lake Charles
Infrastructure
Conception
$283,200 CJ est. value
Lake Charles, LA 70605

LA 98: LA 35 - Llama Road
Infrastructure
Design
$2,500,000 CJ est. value
Rayne, LA 70578

Last Updated 12/20/2022 10:31 AM
Project Title

Sewer Lift Station Relocation

Physical Address View project details and contacts
City, State (County) Jennings, LA 70546   (Jefferson Davis County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Results, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $327,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes construction of a new duplex submersible pump station, installation of new gravity sewer mains, relocation of a water main, connection to existing force main, bypass pumping, demolition of existing pump station and piping, site work, electrical and controls, etc THE CONTRACT DOCUMENTS, consisting of the Advertisement for Bids, Instruction to Bidders, Bid Form, Bid Bond, Agreement, General Conditions, Special Conditions, Performance and Payment Bond, Specifications, and Addenda, may be examined at the following locations during the specified hours: a. Domingue, Szabo & Associates, Inc. 102 Asma Boulevard, Suite 305 Lafayette, LA 70508 Hours: 7:30 a.m. - 5:30 p.m., Monday thru Thursday 7:30 a.m. - 11:30 a.m., Friday One-half of the deposits will be refunded to Bona Fide Prime bidders upon return of additional sets of documents if returned in good condition within 10 DAYS after receipt of bids. Documents containing marks, torn sheets, or unbound sheets are NOT considered to be in good condition. Contractors submitting bids shall be licensed under LA Revised Statutes R.S. 37:2150-2164 and shall be classified under MUNICIPAL AND PUBLIC WORKS CONSTRUCTION. The Bidder shall show his license number on the bid and on the sealed envelope in which their bid is enclosed. Each bid shall be accompanied by suitable bid surety, payable to the City of Jennings, Louisiana, the amount of which shall be five percent (5%) of the amount of the bid. This shall be given as a guarantee that the bidder will execute the contract, should it be awarded to him, in conformity with the Contract Documents. Performance and Payment Bonds will be required. The Contractor shall obtain, maintain during the life of the project and provide to the Owner copies of the following bonds and policies which shall be obtained from surety companies which appear on the U.S. Treasury Circular 570, licensed to do business in the State of Louisiana, in the amounts and for the purpose stated and subject to the Owner's approval: Bid Guarantee" equivalent to 5% of the bid price consisting of a firm commitment, such as a bid bond, certified check, cashier's check, or another negotiable instrument, shall accompany each bid as assurance that the bidder will, upon acceptance of his bid, execute such contractual documents as may be required and within the time specified PERFORMANCE BOND: A performance bond of not less than 100% of the contract price shall be executed to assure the Contractor's faithful performance of the contract PAYMENT BOND: A payment bond of not less than 100% of the contract price shall be executed to assure payment as required by law of all persons supplying labor and material in the performance of the work proved by the contract Each bid shall be submitted only on the Contractor's Bid Form furnished by the Engineer. Any person with disabilities requiring special accommodations must contact the Owner no later than seven (7) days prior to bid opening. No bidder may withdraw his bid for at least forty-five (45) days after the time scheduled for the opening of bids. Each bid shall be submitted only on the Contractor's Bid Form furnished by the Engineer. Owner reserves the right to reject any or all bids for just cause; such actions will be in accordance with Title 38 of the Louisiana Revised Statutes. Completion Date: 180 Calendar days

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents