Similar Projects
Last Updated | 08/10/2022 06:34 AM |
Project Title | Boones Ferry Corridor Sidewalk and Bike Lane Improvements Phase 1 |
Physical Address | View project details and contacts |
City, State (County) | Tualatin, OR 97062 (Washington County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development |
Contracting Method | Competitive Bids |
Project Status | Construction start expected September 2022 |
Bids Due | View project details and contacts |
Estimated Value | $2,514,806 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Bids will not be received after such date and time. Please contact Brooke Baxter at bbaxter@tualatin.gov or 503-691-3044 with any questions about submitting bids. The First-Tier Subcontractor Disclosure form will be received at the location given for the receipt of the bid until 4:00 pm (local time), July 26, 2022. Instructions for providing the First-Tier Subcontractor Disclosure and the required disclosure form are included in the Contract Documents. The disclosure form shall be submitted no later than two working hours, including lunch hours, after the Bid Closing. THE CITY WILL REJECT A BID IF THE BIDDER FAILS TO SUBMIT THE DISCLOSURE FORM WITH THIS INFORMATION BY THE STATED DEADLINE. Major items of work consist of the following: construction of concrete pathways, road widening, curb and sidewalk improvements, curb ramp replacement, storm drain conveyance, asphalt fog coat, striping and signing, pedestrian RRFB signal, modifications to existing pedestrian push buttons, landscaping, and other items as called for on the plans. Contractor shall reach substantial completion of all work except for asphalt concrete paving and striping by April 15, 2023. Contractor shall reach substantial completion of all asphalt paving no later than May 15, 2023. Contractor shall reach substantial completion of striping no later than May 30, 2023. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |