Similar Projects
XFMR 45 KVA Pole Mount
Term Contract, Alteration
Bidding
High Point, NC 27260

Window Cleaning Services
Term Contract
Bidding
Raleigh, NC

Pressure Washing - Kearney Park
Post-Bid
Greenville, NC

F--GRSM_Hemlock_Service_Fy21
Term Contract
Post-Bid

Pressure Washing and Window Cleaning Services
Results
Wilmington, NC 28401

FY22 Portable Toilets
Term Contract
Results
Rocky Mount, NC

Portable Toilet Units
Term Contract
Bidding
Fayetteville, NC

Welding Repair for Regional Maintenance Department
Post-Bid
Raleigh, NC

Parking Decks/Stairwell Pressure Washing Services
Term Contract
Results
Wilmington, NC

Holland and Curtis Hall - Pressure Wash and Sealing Exterior
Alteration
Bidding
Greensboro, NC 27401

Pressure Washing
Post-Bid
Raleigh, NC

Pressure Wash and Repair Expansion Joints
Term Contract, Alteration
Results
$32,500 est. value
Raleigh, NC 27603

Latrines / Hand Washing Stations / Gray Water Tanks / Dumpster
Term Contract
Post-Bid
Fort Bragg, NC

FY22 Portable Toilets
Term Contract
Post-Bid
Rocky Mount, NC

W--Latrines / hand washing Stations- Fort Bragg, NC
Post-Bid
Fort Bragg, NC 28310

Reported 06/01/2022 12:00 AM
Project Title

Power Washing of 78 Units (16 Buildings) - Newtown Community

Physical Address View project details and contacts
City, State (County) Greenville, NC 27834   (Pitt County)
Category(s) Single Trades
Sub-Category(s) Service/Term Contracts
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The range of pressure washing shall consist of horizontal and vertical washing, and shall include, but not be limited to, walls, doors, soffits, fascia, porches, railings, trim, A/C pads, walkways, sidewalks etc. Pressure washing shall remove all foreign material to include, but not be limited to, bugs, bug dropping, spider webs, mold, mildew, oil, grease, adhesives, sand, and dirt. Surface materials generally shall' include, but shall not be' limited to, concrete, masonry, brick, wood, metal,' glass, aluminum, and exterior insulation finishing systems (EIFS).

Details

Division 01 - General Requirements, Cleaning and Waste Management.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents