Similar Projects
2 Million Gallon Hydropillar (South Water Tower) Painting And Repairs
Results
De Kalb, IL 60115

Fuel Storage Improvements
Results
Less than $831,650 est. value
Woodridge, IL 60517

CNG Fuel Station Maintenance
Term Contract
Results
Downers Grove, IL 60515

Removal of Underground Storage Tanks
Results
Rockford, IL 61109

Natural Areas Maintenance and Controlled Burning Services
Term Contract
Post-Bid
Half Day, IL 60069

Two Dri-Steam Gas to Steam Humidifiers
Post-Bid
Des Plaines, IL 60016

2020 Underground Storage Tank System Removal
Results
Warrenville, IL 60555

Installation of One (1) Above Ground Diesel Fuel Storage Tank
Results
Addison, IL 60101

2021 Lasalle County Highway Fuel
Term Contract
Post-Bid
Ottawa, IL

2021 Above Ground Fuel Tank
Term Contract
Post-Bid
Richton Park, IL

Rehabilitation of the 750,000 Gallon Spheroid High Tank
Results
Carol Stream, IL

Removal Of Underground Storage Units
Results
Rockford, IL 61109

Underground Fuel Storage
Post-Bid
Downers Grove, IL

Oil Tank Abatement
Bidding
$250,000 to $500,000 est. value
Chicago, IL 60607

Automated Gas Kilns
Bidding
Glen Ellyn, IL

Last Updated 04/28/2021 03:41 PM
Project Title

Underground Storage Tank System Upgrade - Transportation Department

Physical Address View project details and contacts
City, State (County) Algonquin, Carpentersville, IL 60102 (Kane, McHenry Counties)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Bunker Hill Transportation Facility: Removal and replacement of concrete pavement, limited asphalt pavement, fuel island concrete and features, surface equipment and components, the in-place upgrade of existing UST systems (8,000-gallon gasoline and 10,000-gallon diesel fuel, separate locations), Including the replacement of all existing tank top equipment, the removal and replacement of existing leak detection systems, the removal and reinstallation of the existing product dispensers and fuel management systems, installation of new concrete and asphalt, installation of fuel island canopies (as an alternate), the installation of new fuel management systems (as an alternate), and all other work specified to fully complete the project. Carpentersville Transportation Facility: Removal and replacement of concrete pavement, limited asphalt pavement, fuel island concrete and features, surface equipment and components, the in-place upgrade of existing UST systems (10,000-gallon gasoline and 10,000-gallon diesel fuel, separate locations), Including the replacement of all existing tank top equipment, the removal and reinstallation of the existing product dispensers and fuel management systems, installation of new concrete and asphalt, installation of fuel island canopies (as an alternate), the installation of new fuel management systems (as an alternate), and all other work specified to fully complete the project.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents