Similar Projects
Crest High School Mechanical Systems Replacement - Phase 4 High School Renovations
Renovation
Sub-Bidding
$190,000 CJ est. value
Shelby, NC 28152

Kings Mountain High School Mechanical Systems Replacement - Phase 5 High School Renovations Project
Renovation
Sub-Bidding
$190,000 CJ est. value
Kings Mountain, NC 28086

Sumner Elementary Chiller Replacement Project
Post-Bid
Greensboro, NC 27406

Removal and Replacement of Two (2) Hot Water Heaters
Post-Bid
Wilmington, NC

Steam Repairs Phase VIIIC
Results
$1,200,000 to $1,500,000 est. value
Raleigh, NC 27695

Valley Springs Middle School Mechanical Upgrade
Results
Arden, NC 28704

Clearwater Ceramics Center
Alteration
Construction
Concord, NC

Shelby High School Mechanical Systems Replacement - Phase 6 High School Renovations Project
Renovation
Sub-Bidding
$190,000 CJ est. value
Shelby, NC 28152

Steam and Boiler Water Treatment Services
Post-Bid
Kinston, NC 28504

Johnston CI Boiler and Water Heater Replacement
Results
$420,400 est. value
Raleigh, NC

Laars Magnatherm FT Condensing Boiler
Term Contract
Post-Bid
Raleigh, NC

Building 2 Hydronic Piping Replacement at Vanstory Elementary School
Results
Fayetteville, NC 28303

Boiler Replacement Project
Alteration
Post-Bid
Goldsboro, NC 27530

Chiller/Boiler Pump Replacement and Continuing Education Center
Results
Statesville, NC 28677

ECSU - Mechanical System Upgrades - Viking Tower
Alteration
Post-Bid
Elizabeth City, NC

Last Updated 08/23/2022 09:34 AM
Project Title

Burns High School Mechanical Systems Replacement - Phase 3 High School Renovations Project

Physical Address View project details and contacts
City, State (County) Lawndale, NC 28090   (Cleveland County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $190,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Documents will be available on or after August 1st, 2022. An additional building tour will be available on Tuesday, August 9, 2022 at 9:30 A.M. The courtesy of RSVP is requested. SCOPE OF WORK 1. Provide a new air conditioning system for the main building and main gymnasium. The main system type will be dual temperature fan coil units with dedicated outside air. Secondary system types will include roof and pad mounted Dx equipment. 2. Remove all existing building automation and replace. 3. Project shall be phased per documents and bid with base and alternates as listed in project manual. All Base Bid and Alternate Costs shall account for escalation through end of project. 4. The contractor shall provide all temporary construction barriers and maintain egress paths shown. 5. Provide all associated electrical work to accommodate the upgrades to the mechanical systems. 6. Provide all associated work to integrate existing HVAC equipment with the new BAS. 7. All permit costs are to be paid by Contractor and included in the Bid/Alternate costs Project 021429.01

Details

2 Stories Above Grade, 141,219 SF.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 25 - Integrated Automation.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents