Similar Projects
Formulated Solutions Expansion
New Construction - 24,000 SF
Conception
$6,900,000 est. value
Largo, FL 33773

Tropicana Field Redevelopment / St. Petersburg
Demolition, New Construction, Infrastructure, Renovation - 12,000,000 SF
Conception
$3,800,000,000 CJ est. value
St Petersburg, FL 33705

Deuces Rising Townhomes and Commercial Development
Design
$16,000,000 est. value
Saint Petersburg, FL

US 19 Self Storage
New Construction - 98,587 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Clearwater, FL

Cordova Inn Expansion
Addition, Demolition, Infrastructure - 41,526 SF
Bidding
$12,500,000 CJ est. value
St Petersburg, FL 33701

RFQ Construction Manager at Risk Services - Rosery Road Phase 2 Streets and Infrastructure
Infrastructure
Bidding
$3,033,000 CJ est. value
Largo, FL 33770

Site Improvement
Alteration
Post-Bid
Clearwater, FL 33764

Durham PWOC Phase 2 Winter Storage and Operations
New Construction, Addition
Post-Bid
Dunedin, FL 34698

Furnish and Install One (1) Commercial Steel Building
New Construction - 180 SF
Results
Tarpon Springs, FL 34688

Development of 1250 Cleveland Street
Infrastructure
Results
Less than $1,350,000 est. value
Clearwater, FL 33755

Pasadena Self-Storage
New Construction, Demolition - 82,353 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
South Pasadena, FL 33707

Countryside Storage
New Construction - 98,311 SF
Construction
$5,000,000 est. value
Clearwater, FL 33761

The Miramar Beach Resort
Demolition, New Construction, Infrastructure
Pending Verification
$14,300,000 CJ est. value
St Pete Beach, FL 33707

Tarpon Springs Plaza
New Construction - 4,400 SF
Pending Verification
Tarpon Springs, FL 34689

Bicycle Paths-Bridges - 93272 - City of Clearwater
Infrastructure
Conception
$2,500,000 CJ est. value
Clearwater, FL 33755

Last Updated 12/07/2022 01:52 PM
Project Title

Clearwater Self Storage / Clearwater

Physical Address View project details and contacts
City, State (County) Clearwater, FL 33763   (Pinellas County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Site Development, Warehouse/Storage
Contracting Method Bids by Invitation
Project Status Bidding, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $8,000,000 [brand] Estimate
Plans Available from Selected Bidders
Owner View project details and contacts
Architect View project details and contacts
Description

*The owner requests that all subcontractor / supplier inquiries be directed to the GC Bidder.

Details

5 Stories Above Grade, 70,000 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents