Similar Projects
Construction of a Five (5) Single-family Housing Development
New Construction, Infrastructure
Design
$1,000,000 CJ est. value
Green River, UT 84525

Millsite County Road Riprap and Fish Habitat
Infrastructure
Bidding
$180,000 CJ est. value
Ferron, UT 84523

Millsite County Road Riprap and Fish Habitat
Infrastructure
Bidding
$180,000 CJ est. value
Ferron, UT 84523

Construction of the Castle Dale North Chip Seal Project 2022
Infrastructure
Post-Bid
Castle Dale, UT 84513

Construction of the CVSSD - City Street Project 2022
Infrastructure
Post-Bid
Castle Dale, UT

Bookcliffs Pond Maintenance and Excavating
Infrastructure
Results

Huntington State Park Restrooms Building
Demolition, New Construction, Infrastructure
Results
$698,223 CJ est. value
Huntington, UT 84528

Construction of City Sidewalks
Infrastructure
Post-Bid
Cleveland, UT 84518

CC and H Canal Pipeline Installation Project
Infrastructure
Results
$365,551 CJ est. value
Castle Dale, UT 84513

Reclamation of BLM Pits, Rochester, South Moore and Lila Canyon
Infrastructure
Post-Bid
$223,000 est. value
Castle Dale, UT

Department of Natural Resources Green River State Park Campground and Lodging Expansion
Addition, Demolition, Infrastructure
Results
$3,676,951 CJ est. value
Green River, UT 84525

Installation and Construction of Sidewalk
Infrastructure
Post-Bid
$300,000 est. value
Huntington, UT

Lower Miller Creek BDAs
Infrastructure
Results
$20,000 CJ est. value
Orangeville, UT 84537

Curb and Gutter Project 2022
Infrastructure
Post-Bid
$300,000 est. value
Castle Dale, UT

Sidewalk Project, 2022
Infrastructure
Post-Bid
$80,000 CJ est. value
Orangeville, UT 84537

Last Updated 02/23/2023 06:37 PM
Project Title

Installation and Construction of Approximately 1200 Linear Feet of Sidewalk

Physical Address View project details and contacts
City, State (County) Huntington, UT 84528   (Emery County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $220,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Huntington City is accepting proposals from a General Contractor for the installation and construction of approximately 1200 linear feet of sidewalk. This project is located within Huntington City, in Huntington, Utah. The sidewalk project consists of the following: 1. Site Preparation 2. Form, pour, and finish 60" wide by 4" thick concrete sidewalks with contraction joints and expansion joints. This bond will be made payable to Huntington City and shall accompany the proposal. Interested parties can contact Huntington City (435-687-2436) during regular business hours with project questions. Project proposal packages will be available at the Huntington City Hall at that time. Address: 20 South Main Street P.O. Box 126 Huntington City, Utah 84528. Bid will be awarded on Wednesday February 15, 2023 during the regular scheduled City Council meeting beginning at 6:30 p.m. Huntington City reserves the right to reject any or all proposals or to waive any formality or technicality in any proposal in the interest of the city.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents