Similar Projects
Mallard Creek Wastewater Treatment Plant Ruvi: Bid Packages No. 7A And 7B
New Construction
Bidding
Charlotte, NC

McAlpine Creek WWMF Nutrient Harvesting
Bidding
$13,000,000 est. value
Charlotte, NC

Odor and Corrosion Control Services
Post-Bid
Raleigh, NC 27610

Smith Creek RRF Influent Screenings, Pumping and Grit Removal Improvements
Post-Bid
Wake Forest, NC

Wastewater Treatment Plant Improvements - Filter Replacement
Results
$1,200,000 est. value
Hendersonville, NC

Mocksville-Dutchmans Creek WWTP Renovation
Results
$3,300,000 est. value
Mocksville, NC

NC Aquarium at Pine Knoll Shores Wastewater Maintenance
Term Contract
Bidding
Pine Knoll Shores, NC 28512

Rehabilitation and Repair of the Headworks Facilities
Post-Bid
Greenville, NC 27834

Black River WWTP Aeration System Replacement
Results
$2,500,000 to $2,649,400 est. value
Dunn, NC 28334

Eastside Wastewater Treatment Plant, PTF Effluent Control Gates
Bidding
Jamestown, NC 27282

Industrial Waste Treatment Plant (IWTP) Repairs and Improvements
Post-Bid
$5,000,000 to $10,000,000 est. value
Cherry Point, NC

Northeast Brunswick Regional Wastewater Treatment Plant 2.5 MGD Expansion
Results
Leland, NC

Wastewater Treatment Plant Influent and Headworks Screen Upgrades Project
Post-Bid
Clarkton, NC 28433

Wastewater Treatment Plant Renovation and Hollingsworth Street Wastewater Pump Station Replacement
Results
Less than $835,551 est. value
Bunn, NC 27508

Residuals Management - Wastewater Treatment Division
Post-Bid
Gastonia, NC 28052

Last Updated 11/26/2019 01:18 PM
Project Title

Little Creek WWTP UV Disinfection Replacement

Physical Address View project details and contacts
City, State (County) Zebulon, NC 27597   (Wake County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of the following major items: 1. Construct new UV disinfection channel. 2. Furnish, install and test new Parshall flume and associated instrumentation. 3. Furnish, install and test new pre-selected UV disinfection system and associated auxiliary systems, instrumentation and control weir, designed for a peak hour flow of 6.6 mgd. 4. Remove and dispose of existing UV disinfection system. 5. Perform demolition as noted on contract drawings. 6. Install new yard piping as shown on contract drawings. 7. Install conduit pipe rack, install raceway systems above and below concrete slab, install lighting system and timer control of lights, install and terminate conductors and install ground ring, and perform other electrical and instrumentation work. 8. - Provide services by preselected Owner's Control System Programmer (CSP) for integration of the new UV disinfection system.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents