Similar Projects
Woodbridge Lane, Ridgewood Acres and Woodbridge Lane Pump Station Reconstruction Project
Renovation
Bidding
$1,000,000 to $2,499,999 est. value
Thomaston, CT 06787

Improvements to Cove River Wastewater Pumping Station
Post-Bid
West Haven, CT

Sandy Hook Pump Station Upgrade
Post-Bid
Newtown, CT

Condensate Pump Station at the Ferrara School
Results
$16,952 est. value
East Haven, CT 06513

Wastewater Pump Station Rehabilitation Project
Results
Middlebury, CT

Salisbury and Sharon Regional Transfer Station
New Construction - 6,400 SF
Construction
$3,072,000 est. value
Lakeville, CT 06039

Shepaug Reservoir Gate House Inlet Screen Cleaning
Post-Bid
Waterbury, CT

Removal and Disposal of Grease in Pump Station Wet Wells
Results
Stamford, CT 06901

Batterson Park Pump Station Upgrade
Renovation
Post-Bid
$1,700,000 est. value
Farmington, CT

Sailors Lane Pump Station Replace and Elevate Generator
Results
Milford, CT

Water Treatment Facility Plant Water Pump Station Improvements
Results
Less than $483,200 est. value
West Hartford, CT

Cider Mill Pump Station Upgrade
Results
Glastonbury, CT

Back-up Generator Installation & Pump Control Relocation at Pine Trail, Barbara Avenue and North Main Street Pump Stations
Results
East Hampton, CT 06424

CSO Reduction And SCADA Uprades To The Rose Alley Pumping Station And WPCF
Results
Norwich, CT 06360

Design-Build Standby Generator for Clay Hill Road Pump Station
Results
Stamford, CT

Last Updated 10/18/2019 10:38 AM
Project Title

Horsebarn Hill Pump Station

Physical Address View project details and contacts
City, State (County) Storrs, CT   (Tolland County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $550,000
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description The Horsebarn Hill Pump Station (HBH) receives influent from the northeast portion of campus associated with animal husbandry and was constructed and placed into service circa 1964. The facility does not meet present building codes, most importantly with respect to isolation of hazardous gasses from arc-producing electrical devices. Pump isolation and check valves are in poor condition. Existing pumps are prone to frequent clogging, and upgrade to recommended "chopper" type pumps requires an increase in motor horsepower, which becomes problematic for the existing electrical service and generator.
Details
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents