Similar Projects
BSL 3 Laboratory HVAC and Controls Renovation
Renovation, Alteration
Bidding
Kissimmee, FL 34741

HUD - AC Replacement in LAN Room on 6th Floor
Post-Bid
Miami, FL 33131

Testing & Certifications of Fume Hoods
Post-Bid
Miami, FL 33125

Replacement of AHU-16
Results
Miami, FL 33136

Heat Pump AHU Replacement (SBE Set Aside)
Results
Miami, FL 33136

Weatherization Assistance Program - HVAC and Mechanical
Post-Bid
Less than $14,796 est. value
Miami, FL 33169

Replace Chillers and Air Handlers, Multi-Facilities
Results
$500,000 to $1,000,000 est. value
Homestead, FL 33039

HVAC Chillers/Equipment and Water Treatment Services
Post-Bid
FL

ACC-West Duct Heater Replacement (SBE Set Aside)
Results
$100,000 est. value
Miami, FL 33136

HVAC and Mechanical Products
Term Contract
Post-Bid

J041--Chiller 1 and 3 VSD Replacement
Results
Miami, FL 33125

JL King Ductwork Cleaning Project
Post-Bid
Miami, FL 33132

J045--Services: CLC Re-Heat Replacement, Miami VA
Results
Miami, FL 33125

Gemini ES CEP Upgrades
Post-Bid
Melbourne Beach, FL 32951

Chiller Plant Services
Term Contract
Results
Miami, FL 33199

Last Updated 07/16/2021 10:26 AM
Project Title

Cooler Roof Replacements on Unit 2, 9E, 9W, and 10 - Florida City Farmers Market

Physical Address View project details and contacts
City, State (County) Florida City, FL 33034   (Miami-Dade County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Demolish and tear off existing low slope built-up roofing system. Clean and prep existing metal roof deck to receive new roof system. Remove and replace roof accessories, flashings, fascia, trim, cap, etc. Install 1/2” gypsum fiber roof board with a vapor barrier, mechanically attached to the metal roof deck for temporary dry-in of the roof. Install 1/4” tapered rigid roof insulation panels, fully adhered over a vapor barrier as required. Install fully adhered 1/2” cover board over the tapered roof insulation. Provide new two-ply modified bitumen low slope roof membrane system as specified. Alternate scope to include provision of a 60 mil TPO single-ply roof surface membrane in lieu of a two-ply modified bitumen system. Refer to the Facility Improvement Program narrative and technical specifications for additional requirements.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents