Similar Projects
Reported 06/15/2021 12:00 AM
Project Title

Nanofiltration Water Treatment Plant located in Gautier, Mississippi

Physical Address View project details and contacts
City, State (County) Gautier, MS   (Jackson County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Mobile District Corps of Engineers has a need for a construction contract to “design and construct” a Nanofiltration Water Treatment Plant located in Gautier, Mississippi. The City of Gautier’s existing Ion Exchange Water Treatment Plant is located at the public works department on 3305 Vancleave Road. The treated water from this plant at times has a brown tint. The City wants to add a nanofiltration unit as a treatment alternative to the ion exchange system. Nanofiltration is a relatively new technology for potable water generation that uses a membrane filtration process to remove harmful contaminates. The Nanofiltration treatment system will consist of 4 treatment trains (1 MGD each) and will be housed within a building that will be built on the concrete parking lot near the existing ion exchange tank. The contractor will install the treatment trains, install the underground piping, construct the building enclosure and the concrete pad, construct the clean-in-place system, and install the sodium hypochlorite system (disinfection) and the electrical components necessary to run the Nanofiltration treatment trains. The Nanofiltration treatment trains are expected to remove a sufficient amount of contaminants causing the water color to be brownish at times so that water does not look dirty and the people who rely on the City’s public water system will have greater confidence in the public drinking water and not unnecessarily use alternative water sources. The City of Gautier has provided a conceptual design which will be made available “for information only”. The contractor shall be responsible for locating/verifying all utilities and making any necessary design considerations prior to design completion and construction. It is desired to leave utilities in place to the extent possible, with only minor realignments anticipated, if any. The water treatment facility is the primary wastewater treatment facility for the City of Gautier and must remain in operation during this construction. The facility may have other upgrades ongoing by contract within the facility. Space must be identified during design for material laydown, parking and office trailer that will not impede the daily facility operations or expansions and as close as feasible to the construction area.

Details

Water Treatment Plant, Renovation.
Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents