Similar Projects
Bishop Tract Levee Maintenance Project
Renovation, Infrastructure
Post-Bid
$250,000 est. value
Stockton, CA 95214

Z--BF Sisk Safety of Dams (SOD) Modifications, Phase I
Renovation
Results
$100,000,000 to $500,000,000 est. value
Los Banos, CA

Salem Street Bridge Replacement - 50231 - City of Chico
New Construction, Demolition
Conception
$3,948,118 est. value
Chico, CA 95928

Folsom Dam Raise: LRWD and Main Dam Construction
New Construction
Post-Bid
$100,000,000 to $250,000,000 est. value
Folsom, CA

New River Improvement Project - Calexico Reach
New Construction, Renovation
Bidding
$28,000,000 to $30,000,000 est. value
Calexico, CA

Kansas and Marin Streets Wet Weather Conveyance Tunnel
New Construction
Results
$12,500,000 to $16,000,000 est. value
San Francisco, CA

Folsom Dam - HCR Fox HVOF Rods Replacement
Term Contract
Design
$10,000,000 to $25,000,000 est. value
Folsom, CA 95630

River Diversion Structure Modernization
Renovation
Post-Bid
Sonoma, CA

On-Call Maintenance and Inspection Services for San Gabriel Dam Hydroelectric Project
Term Contract
Bidding
$500,000 est. value
Azusa, CA 91702

Fairmount Park Weir Dam Repairs
Renovation
Results
Riverside, CA 92519

Repair and Replace Culverts
Renovation, Infrastructure
Design
$6,043,000 est. value
Bakersfield, CA 93314

Replace Culverts
Infrastructure
Results
$2,180,000 est. value
Korbel, CA 95550

Big Dalton and San Dimas Dams Access Improvements Project
New Construction
Post-Bid
$6,750,000 to $10,250,000 est. value
Alhambra, CA

Systemwide Emergency Tunnel Ventilation Fan and Damper Replacement - Los Angeles County Metropolitan Transportation Authority (LA Metro)
Renovation
Conception
$99,000,000 est. value
Los Angeles, CA

USACE SPK DBB Construction - Public Law (PL) 84-99 Levee Erosion Repair Site 1151-21
Renovation
Results
$5,000,000 to $10,000,000 est. value
Tracy, CA 95304

Reported 06/24/2022 03:40 PM
Project Title

Sewer Capacity Improvement Projects - 315006 - City Of Morgan Hill

Physical Address View project details and contacts
City, State (County) Morgan Hill, CA 95037   (Santa Clara County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2024
Bids Due View project details and contacts
Estimated Value $2,600,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Sewer Capacity projects are intended to provide for the expansion of the sewer system infrastructure to maintain service levels and prepare for future growth requirements. Key geographic areas have been identified for this effort which include: 1. Dunne Avenue from Murphy Avenue to Condit Road 2. LaCrosse Drive between LaMar Drive & Monterey Road 3. Along Northbound Highway 101, North of Cochrane 4. Llagas Creek Drive- Eagle Springs to Hale Avenue 1. Dunne Avenue from Murphy Avenue to Condit Road This project consists of replacing 950 feet of existing 8-inch sewer pipeline along Dunne Avenue with a new 10- inch sewer pipeline from 230 feet east of Murphy Avenue to Condit Road. This project is intended to accommodate additional flows contributed by residential development east of Highway 101. 2. LaCrosse Drive between LaMar Drive & Monterey Road This project consists of replacing 1,700 feet of existing 10-inch sewer pipeline with a new 12-inch sewer pipeline along La Cross Drive/Vineyard Boulevard between La Mar Drive and Monterey Road. The 2017 Sewer System Master Plan indicated the capacity of the existing 10-inch sewer pipeline is insufficient under existing peak flow conditions and this project is intended to mitigate the capacity deficiency. This project will also provide additional capacity to accommodate additional flows contributed by future developments west of Monterey Road. 3. Along Northbound Highway 101, North of Cochrane This project consists of replacing 1,200 feet of existing 10-inch sewer pipeline along NB US 101 north of Cochrane Road. This project is necessary to accommodate additional flows contributed by planned residential development east of Cochrane Road and north of Peet Road. 4. Llagas Creek Drive- Eagle Springs to Hale Avenue This project consists of replacing 1,950 feet of existing 8-inch sewer pipeline along Llagas Creek Drive from Eagle Springs Court to Hale Avenue. The 2017 Sewer System Master Plan indicated the existing 8-inch sewer pipeline is nearing maximum capacity and recommended the replacement of this pipeline to accommodate additional flows contributed by planned residential developments west of Hale Avenue. As of June 23, 2022 no new CIP issued, this project is currently in the FY 2022-2028 CIP . Funding for this project is allotted in the city's capital improvement plan for construction FY 2023. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2023. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Dam/Tunnel, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents