Similar Projects
RFQ - Architectural and Engineering Services For Bond/capital Projects and on-call Services
Term Contract
Conception
Kansas City, MO 64106

Barstow School Expansion Master Plan
Addition, Demolition, New Construction, Infrastructure
Conception
$10,000,000 CJ est. value
Kansas City, MO 64114

Center High School Restroom Renovations and Center Middle School Gym Renovation
Renovation
Design
$500,000 CJ est. value
Kansas City, MO 64106

Raytown High School Renovation
Renovation
Post-Bid
Raytown, MO 64133

Raytown Central Middle School
Renovation, Addition
Post-Bid
Raytown, MO 64133

Independence School District Kitchen Cafeteria Expansion and Remodel
Renovation
Results
Independence, MO

Blue Springs High School - Freshman Center Temporary Kitchen
New Construction
Results
Blue Springs, MO 64015

2021 Bond - Phase II of District HVAC Improvements - Independence School District
Renovation
Pending Verification
$2,000,000 CJ est. value
Independence, MO 64050

Construction Manager at Risk for Grandview C-4 School District
Renovation
Post-Bid
Grandview, MO 64030

Exterior Improvements at Meadowmere Elementary and Grandview Middle School
Renovation
Results
Grandview, MO 64030

Fort Osage-Kitchen Improvements
Renovation
Post-Bid
Independence, MO 64058

Grain Valley Leadership Center
New Construction
Post-Bid
Grain Valley, MO 64029

Independence School District Secure Entries Phase 2
New Construction
Post-Bid
Independence, Sugar Creek, MO 64055

Freshman Center - Bid Package 02
Renovation, Addition
Post-Bid
Blue Springs, MO 64015

Nowlin Middle School Auxiliary Gym And Locker Rooms HVAC
Renovation, Alteration
Post-Bid
Independence, MO 64052

Last Updated 03/29/2023 02:33 PM
Project Title

2020 Bond - New Middle School - Lee's Summit R-7 School District

Physical Address View project details and contacts
City, State (County) Lees Summit, MO 64063   (Jackson County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids
Project Status Construction start expected November 2020
Bids Due View project details and contacts
Estimated Value $26,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of June 23, 2020, this project is in the pre-construction/negotiated phase. An architect and construction manager has been selected but the names of the these firms have not been disclosed. Although a firm timeline for construction has not been determined, construction is not expected to start prior to October 2020. 2020 Bond Project - New Middle School *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents