Similar Projects
Maintenance and Repair Army Reserve -Parks, CA Reserve Forces Training Area Renovation of Building 331
Renovation
Design
$25,000,000 CJ est. value
Dublin, CA 94568

Renovation of Interior Finishes at École Primaire Sainte-Thérèse, La Baie
Renovation
Sub-Bidding
$300,000 CJ est. value
Compton, CA 90220

Construct EHRM Upgrades CBOC's, SFVAMC, San Francisco
Renovation
Sub-Bidding
$500,000 CJ est. value
San Francisco, CA 94103

FEMA Region 9 Kitchen Millwork
Term Contract
Post-Bid
Oakland, CA 94607

Double Lockers for Chamberlain Creek Fire Center
Alteration
Post-Bid
$250,000 est. value
Fort Bragg, CA 95437

Install Spray Foam Insulation
Alteration
Results
Atwater, CA 95301

Outdoor Pallet Racks with Installation
Alteration
Results
Santa Clara, CA 95050

Casa Sonoma Apartments Rehabilitation
Renovation - 1,077 SF
Pending Verification
$5,000,000 CJ est. value
Calexico, CA 92231

Interior Painting, Installation of Protective Wall Covering, and Replacement of Rubber Cove Base at the Hayward Department of Motor Vehicles (DMV) Field Office
Term Contract
Post-Bid
$45,000 est. value
Hayward, CA 94544

Betty Reid Soskin Middle School Demolition and Refinishing Wing 200
New Construction, Alteration
Results
El Sobrante, CA 94803

Modular Millwork
Infrastructure
Post-Bid
Sacramento, CA

Red Morton Community Center Structural Reinforcement Project
Alteration
Results
Redwood City, CA 94061

SB Minor B - Replace Cabinets and Controllers
Alteration
Post-Bid
$151,000 est. value
Stockton, CA

Laboratory Casework Replacement at Orangewood Continuation High School
Alteration
Results
$50,000 est. value
Redlands, CA 92374

Countertop Barriers and Counter Modifications
Term Contract
Post-Bid
$260,000 est. value
Chino Hills, CA 91709

Last Updated 08/15/2023 05:16 PM
Project Title

Cooling Tower Replacement

Physical Address View project details and contacts
City, State (County) Los Angeles, CA 90012   (Los Angeles County)
Category(s) Single Trades
Sub-Category(s) Finishes/Interior
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $10,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Amendment 02 is issued. Available to interested parties who provide a UEI number (with current SAM registration), and GACA or gmail address to krista.miller@gsa.gov. Solicitation is now available for interested parties. The Solicitation includes Controlled Unclassified Information. For access to all the Solicitation documents, email Contracting Officer, Krista Miller, krista.miller@gsa.gov with your GACA or Google email address. If you do not have a Google or GACA email address, you may obtain one through the following steps: GSA uses Google to provide employees with a way to collaborate in real time, and to create, edit and share work from anywhere. To enable simliar sharing and collaboration in Google with our government customers and business partners, while also ensuring that this shared information is safeguarded and secure, we've created a specialized Gmail account process called GACA - short for the GSA Affiliated Customer Accounts (GACA). Collaborative data stored on GSA's Google Drive and Google Sites systems are compliant to the Federal Information Processing Standard (FIPS) 140-2. This standard ensures that access and transmission occurs via a secure web page using the TLS 1.2 encryption standard. GACA is only authorized for sharing information on Google Drive and Google Sites, it is not authorized to be used for email communications. Applicability - GACA is for those who work for our government customers and business partners who do not use Google in their workplace. Agencies and civilian partners that are using Google in their workplace do not need to create a GACA account. GACA accounts must NOT be used by GSA employees and contractors in lieu of a gsa.gov account. How to create a GSA Affiliated Customer Account (GACA) in Gmail The person who will be using the GACA account (the government agency customer or the business partner) must create a Gmail account at http://mail.google.com/mail/signup and follow the process below: o enter their first name and last name, o enter their username: must start with "GSA." then first name, last name - example: GSA.johnsmith@gmail.com (mandatory), o complete all required fields, accept the Terms of Service and submit the request, and o set up 2-Step Verification (also known as two-factor authentication) using a smart phone that can receive simple messages (mandatory). The GSA IT Security Staff continuously monitors all shared files in Google Drive, and sharing in GSA's Google Sites. If non-compliance with this process is detected, then our staff will notify users of non- compliance with this process. After notification, if the sharing has been determined to be with a user that maintains a G Suite account, no further action will be required. Scope Description: The contract is anticipated to involve the following work to be done at the federal building at 300 N. Los Angeles St., Los Angeles, CA: The overall strategic project goal of the Design-Build (DB) Contractor is for the replacement of (4) 2 Cell Cooling Towers and to perform structural sub-platform and main platform repairs and/or replacement within an occupied building without disruption to occupants and to utilize sustainable design and construction strategies where applicable and practical. Phase 1 Cooling Tower 1 and/or 2: Using the government provided Pre-Alteration Survey, provide an abatement work plan for review and approval and perform hazmat abatement work according to the findings and the approved plan. Furnish and set-up (1) 500 Ton temporary skid mounted Cooling Tower adjacent to the building on Los Angeles St. within a lockable chain link fence enclosure affording adequate NEC and service clearances, and pipe temporary bypass CWS/R lines to POCs in the basement. Provide temporary make-up water (MUW) and drain down piping indirectly to the nearest approved sanitary sewer. Provide temporary electrical power via a 200 KVA skid mounted genset and electrical disconnect and service power to the skid mounted Cooling Tower. Provide biocidal and other chemical treatment as needed for a temporary cooling tower. Obtain necessary permits and special inspections if/as required from the City of Los Angeles Public Works. Disconnect controls from CT-1 and/or 2, demolish condensate drain, make-up water lines and electrical service back to the distribution panel. Partially demolish Condenser water supply and return lines. Using a helicopter crane or other crane, demolish and remove CT-1 and/or 2 and remove from site to contractor chosen location for recycling and disposal. Demolish and replace CT-1 and/or 2 structural subframe(s). Fabricate off-site or assemble on site, replacement subframe support steel frames, prep and apply corrosion resistant paint or apply elastomeric coating with minimum 10-year warranty. Replace excessively corroded members, or repair CT main structural framing, removing all existing finish down to bare metal. Prepare and apply corrosion resistant paint or apply elastomeric coating with minimum 10-year warranty. Verify or correct capacity of existing mainframe and supporting roof beams, for gravity and lateral loads relative to weight of new CT's and axillary equipment. Provide special inspections of Class 1 weld fit-up and testing and AWS inspection of the welded connections and inspect existing bolted connections to ensure soundness. Evaluate structural capacity and attachments of catwalks and pipe support for possible reuse. Install engineered vibration isolators and seismic bracing for CT-1 and/or 2 and lift and install new CT(s) directly onto sub-framing. Repair pitch pockets and roofing as required in the work area. Provide new power from distribution panel to new electrical disconnect and whip and connect to tower(s) and CW pump(s). Install new MUW lines and drain down lines and route to existing indirect sanitary roof drain for each tower. Reconnect BAS controls, functional test and Cx controls for pumps, CT(s) and BAS via endpoint-to-endpoint testing and verification. Phase 2 Cooling Tower 3 and/or 4: Replace the (2) existing nominal 900-ton Cooling Towers (CTs) in one or two phases of construction. Using the government provided Pre-Alteration Survey, provide an abatement work plan for review and approval and perform hazmat abatement work according to the findings and the approved plan. Disconnect controls from CT-3 and/or -4, demolish condensate drain, make-up water lines and electrical service back to the distribution panel. Partially demolish Condenser water supply and return lines. Using a helicopter crane or other crane, demolish and remove CT-3 and/or -4 and their respective CW pumps and remove from site to contractor chosen location for recycling and disposal. Demolish and replace CT-3 and/or -4 structural subframe(s). Fabricate off-site or assemble on site, replacement subframe support steel frames, prep and apply corrosion resistant paint or apply elastomeric coating with minimum 10-year warranty. Replace excessively corroded members, or repair CT main structural framing, removing all existing finish down to bare metal. Prepare and apply corrosion resistant paint or an elastomeric coating with minimum 10-year warranty. Verify or correct capacity of existing mainframe and supporting roof beams, for gravity and lateral loads relative to weight of new CT's and axillary equipment. Provide special inspections of Class 1 weld fit-up and testing and AWS inspection of the welded connections and inspect existing bolted connections to ensure soundness. Evaluate structural capacity and attachments of catwalks and pipe support for possible reuse. Install engineered vibration isolators and seismic bracing for CT-3 and/or -4 and lift and install new CT(s) directly onto sub-framing. Repair pitch pockets and roofing as required in the work area. Provide new power from distribution panel to new electrical disconnect and whip and connect to tower(s) and CW pump(s). Install new MUW lines and drain down lines and route to existing indirect sanitary roof drain for each tower. Reconnect BAS controls, functional test and Cx controls for pumps, CT(s) and BAS via endpoint-to- endpoint testing and verification. (Note: There is no BAS programming nor graphics scope) 05/17/2023: Amendment 01 issued. Available to interested parties who provide a UEI number (with current SAM registration), and GACA or gmail address to krista.miller@gsa.gov. Estimated Range - between $5M and $10M. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 09 - Finishes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents