Similar Projects
River Street Residences
New Construction - 408,315 SF
Design
$10,000,000 CJ est. value
Austin, TX 78701

BBVA Tower
New Construction
Design
Austin, TX 78701

Zilker Water and Wastewater Pipeline Renewal: Treadwell St. Area REBID
Infrastructure
Bidding
$8,600,000 CJ est. value
Austin, TX 78701

IH 35 - Widen Road - Add Lanes
Infrastructure
Bidding
$498,774,119 CJ est. value
Austin, TX 78751

Lanzola Office
Build-Out - 5,810 SF
Post-Bid
Manchaca, TX 78652

Parmer Village Multi-Family Apartment - Building 1 and Sitework
New Construction
Post-Bid
Austin, TX 78753

Redevelopment of 1215 Red River and 606 East 12th Streets
Results
Austin, TX 78701

183A Phase III Project - Construction Engineering & Inspection Services
Results
Less than $180,000,000 est. value
Austin, TX 78705

405 Colorado
New Construction
Construction
$68,500,000 est. value
Austin, TX 78701

Apple Campus
New Construction - 3,000,000 SF
Construction
$1,000,000,000 est. value
Austin, TX 78727

East Village
New Construction
Pending Verification
$1,000,000,000 est. value
Austin, TX 78754

Velocity
New Construction - 3,795,000 SF
Pending Verification
$10,000,000 CJ est. value
Austin, TX 78617

Waller Creek - Mixed Use Development
New Construction - 2,700,000 SF
Design
$520,000 est. value
Austin, TX 78701

Lyft Vehicle Center - Emergency Eyewash and Shower Rollout
Renovation
Post-Bid
Austin, TX 78749

Lakeway Highlands Phase 2 Section 8
Results
Lakeway, TX

Last Updated 08/02/2022 12:09 PM
Project Title

Burnet Road Office Building

Physical Address View project details and contacts
City, State (County) Austin, TX 78756   (Travis County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Office, Parking Garage, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $28,088,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Preliminary plans call for the building to be constructed at an angle; the structure will face Burnet Road and North Street. A parking garage with 331 spaces will be located behind the office building. The project includes a rainwater garden, and demolition of five structures, including a nursery that is set to relocate. As of August 2, 2022, a a general contractor has been selected. Sitework is recently underway.

Details

Parking Space/Stalls, 331 Parking Spaces. 3 Stories Above Grade, 180,000 SF.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle and Pedestrian Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 14 - Conveying Equipment, Elevators.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents