Similar Projects
Tyndall AFB Civil Works IDIQ Sources Sought
Design
Panama City, FL 32403

FY21 SOF Combat Aircraft Parking Apron - North, Hurlburt Field, Florida
Term Contract
Bidding
$25,000,000 to $100,000,000 est. value
Eglin AFB, FL

Runway Shoulder Pavement Sealcoating
Infrastructure
Bidding
Tampa, FL

Homestead ARB BAK 12
Post-Bid
$1,000,000 to $5,000,000 est. value
Homestead, FL 33033

Ground Run-Up Enclosure
Post-Bid
Less than $4,000,000 est. value
Melbourne, FL 32901

General Aviation Center Civil Package
Results
Punta Gorda, FL 33982

Rehabilitate Northeast Quadrant Taxiways A, B and C at Lakeland Linder International Airport
Results
Lakeland, FL 33801

Runway 4-22 Rehabilitation/Reconstruction and Wetlands Mitigation Phase 2
Infrastructure
Bidding
$16,000,000 est. value
Punta Gorda, FL 33982

Taxiway B Rehabilitation Winter Haven Airport
Post-Bid
$358,000 est. value
Winter Haven, FL 33881

Repair Cracks, Joints, Slabs, Airfield
Results
$1,000,000 to $5,000,000 est. value
Patrick AFB, FL 32925

Runway 6-24 and Taxiway B and D Lighting Rehabilitation at Apalachicola Regional Airport
Post-Bid
Apalachicola, FL 32320

Construction Management at Risk Services for the Cecil Airport Eastside Development Site
New Construction - 370,000 SF
Results
Jacksonville, FL 32221

Remove, Re-Grade, and Install New Rubberized Surface Material Under Static Aircraft Mounds.
Post-Bid
Panama City, FL 32403

Runway 5-23 and Apron Rehabilitation George T Lewis Airport
Results
Cedar Key, FL 32625

Taxiway Delta Phase II Reconstruction
Post-Bid
Pompano Beach, FL 33060

Last Updated 07/19/2021 01:49 PM
Project Title

Rehabilitation of Runway 9L-27R Touchdown Zone Keel Repair

Physical Address View project details and contacts
City, State (County) Sanford, FL 32773   (Seminole County)
Category(s) Heavy and Highway
Sub-Category(s) Runways/Taxiways
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project can generally be described: Rehabilitation of Runway 9L-27R keel section in the touchdown zone for Runway 9L. The project work consists of milling and overlaying a 50-foot-wide keel section for approximately 2,250 feet of the Runway between Taxiway B2 and Taxiway B4. The work also includes crack sealing on the milled surface, grooving the new asphalt, and reestablishing runway markings. The time of completion for the project is anticipated to be 5 calendar days to achieve Substantial Completion (excluding Mobilization/Shop Drawing Approval Period). An additional 10 calendar days of night work will be required 30-days later to achieve Final Completion in order to complete the pavement grooving and permanent markings.

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents