Similar Projects
HVAC Services 2021
Alteration
Post-Bid
Warner Robins, GA

Animal Control HVAC System
Alteration
Post-Bid
$50,000 est. value
Warner Robins, GA 31088

116 ACW Uhhz192019 B2051 Repair/Clean HVAC Ducts
Term Contract
Results
Robins Air Force Base, GA

116 ACW Uhhz212015 B2039 Repair/Clean HVAC
Term Contract
Results
Robins Air Force Base, GA

Air Purification System / Process
Term Contract
Post-Bid
Warner Robins, GA 31093

116 ACW Uhhz212014 B2045 Repair/Clean HVAC
Term Contract
Results
Robins Air Force Base, GA

Quick-Start Lab HVAC Building C (Re-Bid)
Renovation
Post-Bid
$400,000 CJ est. value
Warner Robins, GA 31088

HVAC Renovation to Northside High School
Alteration
Results
Less than $3,100,000 est. value
Warner Robins, GA 31093

Chiller & HVAC Maintenance at City Hall
Renovation
Post-Bid
$500,000 CJ est. value
Warner Robins, GA 31093

Perry High School HVAC
Alteration
Results
Perry, GA 31069

HVAC Renovation to Bonaire Elementary School.
Alteration
Results
Less than $360,000 est. value
Bonaire, GA 31005

HVAC Renovation to Centerville Elementary School
Alteration
Results
Less than $308,000 est. value
Centerville, GA 31028

HVAC Renovation to Northside Middle School
Alteration
Results
Less than $1,900,000 est. value
Warner Robins, GA 31093

Replacement of HVAC Units at Wellston Center
Alteration
Results
Warner Robins, GA 31093

HVAC Replacement - Multiple Locations
Alteration
Results
GA

Last Updated 02/08/2023 02:11 PM
Project Title

Georgia Agricultural and Exposition Center HVAC Renovations at Reaves Arena

Physical Address View project details and contacts
City, State (County) Perry, GA 31069   (Houston County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $850,000 [brand] Estimate
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Qualified General and Mechanical Contractors interested in bidding on the project shall have been in business for a minimum of seven (7) years, successfully completed a minimum of three (3) similar construction projects. A list of all similar renovation and modification projects along with all other projects completed or currently under construction under the firm name during the last five (5) years shall be provided with bid package to justify qualifications. Such list shall contain as a minimum the Engineer, owner, project name, building type, project type, building size, total project costs, change order costs, notice- to-proceed date and substantial completion date. A roster containing the names of all those Contractors attending the conference will be compiled and verification of a Bidders' attendance at the conference will be required before acceptance of his/her Bid. Bids from Contractors not attending the Pre-Bid Conference will not be accepted The work includes but is not limited to: o Demolition of six (6) existing DX split systems with hot water heat. o Construction of four (4) structural steel and concrete structures to support four (4) new packaged DX systems with hot water heat. o A new control system. o New electrical circuits extended as shown. o Testing, adjusting and balancing (TAB) work as specified Only bids received from Contractors registered with the Engineer will be accepted. Contract, if awarded, will be on a lump sum basis. No bid may be withdrawn for a period of 60 days after time has been called on date of opening. Bids must be accompanied by a Bid Bond in an amount not less than 5% of the Base Bid. Both a Performance and a Payment Bond will be required in an amount equal to 100% of the Contract Price. The Owner reserves the right to reject any or all bids and to waive technicalities. Summary of Work: The work includes but is not limited to: o Demolition of six (6) existing DX split systems with hot water heat. o Construction of four (4) structural steel and concrete structures to support four (4) new packaged DX systems with hot water heat. o A new control system. o New electrical circuits extended as shown. o Testing, adjusting and balancing (TAB) work as specified.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents