Similar Projects
CHRL Pump Station 1A, 2 and 3
Infrastructure
Design
$630,000 est. value
WA

Booster Station Replacement - Phase II
Term Contract
Bidding
$2,800,000 to $3,100,000 est. value
Latah, WA

Tapteal 1 Pump Station Upgrade
Infrastructure
Post-Bid
Richland, WA 99352

Condensate Pump 1 Alpha Refurbishment
Alteration
Post-Bid
Richland, WA

Water Station 5 Reservoirs and Pump Station
Infrastructure
Results
$28,250,000 est. value
Vancouver, WA 98687

Gooseberry Point Wastewater Treatment Plant Improvements
New Construction, Renovation, Infrastructure
Results
$13,000,000 to $14,500,000 est. value
Bellingham, WA 98226

Aurora 1160 Series Pump Refurbishment
Alteration
Post-Bid
Keyport, WA 98345

Well No. 6
Alteration
Results
$2,189,000 est. value
College Place, WA 99324

Kayak Well Rehabilitation
Infrastructure
Post-Bid
$90,000 est. value
Stanwood, WA 98292

Furnish and Install 60HP Input Pump Motor
Infrastructure
Results
Ridgefield, WA 98642

Hanford Integrated Tank Disposition Contract
Alteration
Post-Bid
WA

Illinois Well Facility
Infrastructure
Results
$3,025,682 to $3,276,814 est. value
Ellensburg, WA

Havana Well Station - Phase One
New Construction, Infrastructure
Post-Bid
Spokane Valley, WA

Tacoma Landfill Decommission Gets and Gas Probes
Infrastructure
Results
$593,000 est. value
Tacoma, WA 98421

Downtown Stormwater Treatment Project
Infrastructure
Post-Bid
$10,400,000 est. value
Marysville, WA

Reported 03/17/2022 12:00 AM
Project Title

Installation of a 40HP Submersible Pump and Motor

Physical Address View project details and contacts
City, State (County) Winthrop, WA   (Okanogan County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Installation of a 40hp submersible pump and motor including supply and installation of necessary pressure tanks and fire hydrant.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Facility Fire Hydrants, Storage Tanks for Fire-Suppression Water, Pressurized Storage Tanks for Fire-Suppression Water.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents