Similar Projects
Water Treatment Plant
Results
Less than $3,400,000 est. value
Epping, NH 03042

Construction of a New Water Treatment Plant
Design
$4,000,000 est. value
Epping, NH 03042

Locke Lake Water Treatment Upgrades
Renovation, Addition, Demolition - 560 SF
Construction
Barnstead, NH 03225

Water Treatment Facility Filter Upgrades
Results
Keene, NH

Waste Water Treatment Plant Operation, Sampling, Testing and Maintenance at Wallis Sands State Park
Term Contract
Results
Rye, NH 03870

Design, Installation and Maintenance of Water Supply Treatment Systems
Post-Bid
Less than $750,000 est. value
Concord, NH 03302

Last Updated 08/18/2021 11:42 AM
Project Title

Merrimack River Water Treatment Plant and Raw Water Pump Station

Physical Address View project details and contacts
City, State (County) Manchester, NH   (Hillsborough County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method
Project Status Construction Commenced May 2021
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of constructing a new 7.2 million gallon per day drinking water treatment plant and raw water pumping station. Raw water will be drawn into a radial collector well and pumped to a new treatment facility. The work includes an approximately 3,000 square foot pumping station building and an approximately 20,000 square foot treatment building, including pumping equipment, treatment process equipment, yard piping, a clear well tank, earthen lagoons, and other related work. The project is scheduled to start construction in spring 2021 and is anticipated to be substantially complete in spring 2023. The primary source of funding is a NH Drinking Water Trust Fund with Davis-Bacon prevailing wages and associated monthly certified payment documentation. Interested Contractors are required to list in detail their applicable experience with the above project components

Details

,, 23,000 SF - Water Treatment Plant, Approximately 3,000 SF New Construction, Water Treatment Plant, Approximately 20,000 SF New Construction.
Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents