Similar Projects
Faculty Office Building - California State University - Bakersfield
New Construction
Conception
$15,684,000 est. value
Bakersfield, CA 93311

Student Housing Northeast - Phase 3 - California State University - Bakersfield
New Construction, Infrastructure - 120,000 SF
Conception
$67,772,000 CJ est. value
Bakersfield, CA 93314

AutoZone #6049 / Bakersfield
New Construction, Infrastructure - 6,500 SF
Design
$1,500,000 CJ est. value
Bakersfield, CA 93311

2-Lane Conventional Highway to a 4-Lane Expressway
Infrastructure
Design
$29,400,000 CJ est. value
Lost Hills, CA 93249

Contract for Construction of HUD-funded Curb, Gutter and Sidewalk Union and East Truxtun Area
Infrastructure
Bidding
$249,550 CJ est. value
Bakersfield, CA 93301

RFP - Professtional Geotechnical Services for Pinon Street Extension Project
Infrastructure
Bidding
$300,000 CJ est. value
Tehachapi, CA 93561

Poplar Place Apartments
New Construction, Infrastructure
Sub-Bidding
$20,000,000 CJ est. value
Wasco, CA 93280

AutoZone #5666 / Bakersfield
New Construction, Infrastructure - 7,000 SF
Post-Bid
$1,500,000 CJ est. value
Bakersfield, CA 93301

FANUC Robot Tabletop Systems
Renovation, Alteration
Post-Bid
Bakersfield, CA 93314

Bakersfield College Delano Center LRC Multi-Purpose Building Project
New Construction
Results
$24,000,000 est. value
Bakersfield, Delano, CA 93314

Pavement Rehabilitation 2021-2022
Infrastructure
Results
$1,532,735 CJ est. value
Bakersfield, CA 93307

South Dennison Road Water Main Replacement Project
Infrastructure
Construction
$649,486 CJ est. value
Tehachapi, CA 93561

1001 Baker Street Affordable Housing
New Construction, Infrastructure - 5,000 SF
Pending Verification
$44,728,542 CJ est. value
Bakersfield, CA 93305

Apartments at the Outlets at Tejon
New Construction, Infrastructure
Pending Verification
$187,000,000 CJ est. value
Arvin, CA 93203

Energy and Engineering Innovation Center - California State University - Bakersfield
New Construction, Infrastructure
Conception
$83,000,000 CJ est. value
Bakersfield, CA 93311

Last Updated 12/29/2022 11:04 AM
Project Title

Kern Community College District - Arvin Educational Center - Measure J Project

Physical Address View project details and contacts
City, State (County) Arvin, CA 93203   (Kern County)
Category(s) Education, Heavy and Highway
Sub-Category(s) College/University, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $40,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This project is anticipated to start on approximately September 15, 2022 and is anticipated to have a duration of 485 calendar days for completion. A Payment Bond for contracts over $25,000 and a Performance Bond for all contracts will be required prior to commencement of work. These bonds shall be in the amounts and form called for in the Contract Documents. No Contractor or Subcontractor Shall Be Qualified to Bid on, Be Listed in a Bid Proposal, Subject to the Requirements of 4104 of the Public Contract Code, for a Public Works Project (Submitted on or After March 1, 2015) Unless Currently Registered With the Department of Industrial Relations (Dir) and Qualified to Perform Public Work Pursuant To Labor Code 1725.5. No Contractor or Subcontractor May Be Awarded a Contract for Public Work on a Public Works Project (Awarded After April 1, 2015) Unless Registered With the Dir. The Following Notice Is Given as Required by Labor Code Section 1771.5(B)(1): Contractor and Any Subcontractors Are Required to Review and Comply With the Provisions of the California Labor Code, Part 7, Chapter 1, Beginning With Section 1720, As More Fully Discussed in the Contract Documents. These Sections Contain Specific Requirements Concerning, for Example, Determination and Payment of Prevailing Wages, Retention, Inspection, and Auditing Payroll Records, Use of Apprentices, Payment of Overtime Compensation, Securing Workers Compensation Insurance, and Various Criminal Penalties or Fines Which May Be Imposed for Violations of the Requirements of the Chapter. Submission of a Bid Constitutes Contractors Representation That Contractor Has Thoroughly Reviewed These Requirements Owner Will Retain 5% of the Amount of Any Progress Payments. Owner Will Retain 10% of the Amount of Any Progress Payments Because the Project Has Been Found to Be Substantially Complex on the Basis of. This Project Requires Does Not Require Prequalification Pursuant to Ab 1565 of All General Contractors and All Mechanical, Electrical, and Plumbing Subcontractors. However, the Contractors Prequalification Questionnaire Form Is to Be Submitted With All Bids. If Required, a Prequalification Package May Be Obtained by Downloading the Necessary Forms From (a Bid Package Will Not Be Accepted From Any Bidder That Is Required to Submit a Completed Questionnaire and Supporting Documents Pursuant to Ab 1565, but Has Not Done So at Least Ten (10) Business Days Prior to the Date Fixed for the Public Opening of Sealed Bids or That Has Not Been Prequalified for at Least Five (5) Business Days Prior to That Date.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents