Similar Projects
Industrial/Commercial Type Washer and Dryer
Design
Fort Bragg, NC

Three (3) Zero Turn Rider Mowers
Post-Bid
Fayetteville, NC

12` Batwing Finish Mower
Post-Bid
Fayetteville, NC

Audio Visual System (Including Install)
Results
Fort Bragg, NC 28403

19-6-SW Tracked Conveyor
Results
Fayetteville, NC

Commercial Kitchen Equipment
Post-Bid
Fayetteville, NC

Crown Coliseum Ice System Replacement
Results
NC

Landfill Compactor
Post-Bid
NC

Compact-Crane Lift System
Results

Pizza Oven
Post-Bid
Fort Bragg, NC

39--Monorail Electric Chain Hoist Trolley
Results
Fort Bragg, NC

US Army Kiosks
Post-Bid
Fort Bragg, NC - El Paso, Fort Hood, TX 19111

Various Large Commercial Food Equipment
Post-Bid
Fayetteville, NC

54--Modular Trailer
Post-Bid
Fayetteville, NC 28306

Walk-in Freezer and Cooler Replacements for Cliffdale Elementary School
Post-Bid
Fayetteville, NC 28304

Last Updated 09/26/2019 09:36 AM
Project Title

W--Crane Rental - Ft Bragg, NC

Physical Address View project details and contacts
City, State (County) Fort Bragg, NC   (Cumberland County)
Category(s) Single Trades
Sub-Category(s) Equipment
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description The National Guard - North Carolina requires the following items, Meet or Exceed, to the following: LI 001: Crane rental and operator in accordance with the SOW. Wage Determination No.: 2015-5503, Revision No.: 1, Date Of Revision: 01/17/2017 Applies for rates of the 23440 - Heavy Equipment Operator., 1, Job; LI 002: Contractor Manpower Reporting (CMR) The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract or ARMY collection site. The contractor is required to completely fill in all required data fields using the following web address: http://www.ecmra.mil/. Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year.
Details
Division 41 - Material Processing and Handling Equipment, Cranes and Hoists, Cranes.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents