Similar Projects
Rock Removal - Boston Harbor Federal Navigation
Post-Bid
$75,000,000 to $150,000,000 est. value
Boston, MA

Detention Pond Dredging
Post-Bid
Less than $80,000 est. value
Greenfield, MA 01301

Muddy River Flood Damage Reduction - Phase 2, Boston and Brookline, Massachusetts
Results
$25,000,000 to $100,000,000 est. value
Boston, Brookline, MA

Muddy River Flood Damage Reduction - Phase 2, Boston and Brookline, Massachusetts
Results
$25,000,000 to $100,000,000 est. value
Boston, Brookline, MA

Lake Street Landing Dredge Project
Post-Bid
Tisbury, MA

Plymouth Harbor Dredging
Results
Less than $4,500,000 est. value
Plymouth, MA

Maintenance Dredging of The Newburyport Harbor, Massachusetts Federal Navigation Project
Post-Bid
$5,000,000 to $10,000,000 est. value
Newburyport, MA

Stage Harbor Channel Dredging
Results
Less than $507,500 est. value
Chatham, MA 02633

Wellfleet Harbor Maintenance Dredging
Results
$1,000,000 to $5,000,000 est. value
Wellfleet, MA

Lower Harbor CAD Cell No. 4
Results
Less than $14,500,000 est. value
New Bedford, MA

Boston Harbor Navigation Improvement Project-Phase 3 Rock Removal
Results
$100,000,000 to $250,000,000 est. value
Boston, MA 02128

Butler's Pond Dredging and Storm Water Treatment
Results
Less than $800,000 est. value
Quincy, MA 02169

White Brook and Broad Brook Sediment Basins Maintenance Dredging
Results
Less than $240,000 est. value
Easthampton, MA 01027

James Thomas Apartments Development Site Improvement Project
Results
Less than $40,000 est. value
Taunton, MA 02780

Little Bay Dredge
Results
Bourne, MA

Last Updated 11/11/2020 08:05 AM
Project Title

2020 Dead Neck Sampson's Island Dredging and Beach Nourishment (Phase 3)

Physical Address View project details and contacts
City, State (County) Hyannis, MA 02601   (Barnstable County)
Category(s) Heavy and Highway
Sub-Category(s) Dredging
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $475,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Includes, but is not limited to, Strip, remove and properly dispose (at an approved off-site location) of vegetation within proposed dredging area, coordination with County Dredge, construction support of County Dredge, excavation of dewatering/sediment handling basins, dewatering, handling, hauling and spreading of dredged material (up to approximately 45,200 cubic yards) to beach nourishment areas. Project also includes the removal and disposal of up to approximately 1,000 cubic yards of fine sediment (mechanically dredged) material unsuitable for beach nourishment.

Details

Division 35 - Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Dredging.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents