Similar Projects
Freedom Trail Phase III 2022 Extension
Infrastructure
Post-Bid
Akron, OH

Richfield Elementary Parking Lot Renovation
Infrastructure
Post-Bid
$1,200,000 est. value
Richfield, OH 44286

Mcdonnell Trailhead to Bolivar Towpath Trail Connection General Contract
Results
$374,700 est. value
Akron, OH 44308

SUM-91-9.96 Sidewalks
Results
$728,986 est. value
Stow, OH

Broadview Sidewalks
Infrastructure
Post-Bid
$200,000 est. value
Richfield, OH 44286

2021 Parks Pavement Maintenance
Results
Less than $48,092 est. value
Green, OH 44232

Grant Street Extension and Parking Lot Construction
Infrastructure
Post-Bid
$200,000 est. value
Richfield, OH 44286

Concrete Maintenance and Repair
Results
$118,000 est. value
Tallmadge, OH

2021 Concrete and Catch Basin Replacement Program
Results
Hudson, OH

Front Street Summit DD Parking Lot Expansion
Results
Less than $606,695 est. value
Cuyahoga Falls, OH 44224

Nordonia Hills Branch Parking Lot Improvements
Results
Northfield, OH 44067

Annual Sidewalk, Curb and Ramp and Drive Approach Replacement Program
Results
$211,317 est. value
Cuyahoga Falls, OH

Macedonia Family Recreation Center - Parking Lot Resurfacing
Results
Less than $280,000 est. value
Macedonia, OH

Mud Brook Greenway Trail Phase I
Results
Stow, OH 44224

2021 Concrete Slab Replacement, Storm Water Inlet Repairs and Asphalt Street Repairs Project
Results
Less than $410,000 est. value
Fairlawn, OH 44333

Last Updated 05/27/2022 12:39 PM
Project Title

Replacement and/or Repair of Concrete Sidewalks, Curbs/Ramps and Drive Approaches

Physical Address View project details and contacts
City, State (County) Cuyahoga Falls, OH   (Summit County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $205,582
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Removal of sidewalk, various curb, drive approach and appurtenances at locations specified by the City Project Inspector. The forming, pouring and finishing of sidewalk, various curbs drive approach & ramps at locations that had been removed. Restoration of lawn areas, trees, fences, streets or any appurtenance located in adjacent areas damaged by performance of the above work. Excavation, installation and backfilling of water valve boxes located in removed sidewalk as directed by the City Project Inspector. Patching of existing concrete driveways with new concrete to meet replaced concrete. Asphalt appurtenances abutting against sidewalk shall be patched with ODOT Specification 448 Hot Mix Asphalt to make a smooth transition between asphalt and concrete. Replacement and installation of house drains. This will include securely hooking the new drain up to existing drains with a watertight connection. Construction of New Sidewalk, Per ODOT Specification 608 Walks, Curb Ramps and Steps. Prepare base, Per ODOT Specification 203 Roadway Excavation and Embankment for drive approach, new sidewalks, and various curbs.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents