Similar Projects
Crack Sealing
Infrastructure
Bidding
$2,000,000 CJ est. value
Smyrna, IN 47250

Darling-Brush College Road Sanitary Sewer Extension
Infrastructure
Bidding
Lafayette Township, IN 47119

Concrete and Materials
Post-Bid
Logansport, IN

Concrete Work
Alteration
Post-Bid
Reynolds, IN

Brandonwood Concrete Street Repairs
Infrastructure, Alteration
Results
Fort Wayne, IN

Hudnut Commons Garage Concrete Repairs
Alteration
Results
Indianapolis, IN 46213

Concrete Cut Repair Services
Term Contract, Alteration
Post-Bid
Fort Wayne, IN

Alley Reconstruction - Madison Street, East Jefferson Boulevard, Harmar Street, Division Street
Infrastructure, Alteration
Results
Fort Wayne, IN 46895

2022 Concrete and Flowable Fill Materials
Term Contract
Post-Bid
Jasper, IN

Alley Reconstruction - Madison Street, East Jefferson Boulevard, Francis Street, Harmar Street
Infrastructure, Alteration
Results
Fort Wayne, IN 46895

Concrete
Term Contract
Post-Bid
Lebanon, IN 46052

Jasper Campus Miscellaneous Concrete Work
Alteration
Results
Jasper, IN 47546

Stone Materials
Infrastructure, Alteration
Post-Bid
Schererville, IN

2022 Miscellaneous Concrete Package
Alteration
Results
Fort Wayne, IN

Ivy Tech Community College Indy C4 Exterior Concrete Stair Project
Renovation, Alteration
Post-Bid
$110,000 est. value
Indianapolis, IN 46208

Last Updated 03/15/2023 09:36 AM
Project Title

Turf and Improvements - 2023 Project

Physical Address View project details and contacts
City, State (County) Kokomo, IN 46901   (Howard County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $593,505 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Each bid proposal shall include all labor, material, and services necessary to complete the project in strict accordance with the drawings and specifications as prepared and on file in the office of MSKTD & Associates, Inc., 1715 Magnavox Way, Fort Wayne, Indiana 46804. The Project includes the installation of artificial turf at the varsity softball field. The work includes a new outfield fence and padding at the varsity field. The bids shall be a single prime, lump sum. The bid opening will be public. Bids shall be properly and completely executed in accordance with the Instructions and Supplementary Instructions to Bidders and shall be submitted on the most current version of Indiana Form 96 and the Supplementary Bid Form included in the specifications. A Bid Bond in the amount of 5% of the bid shall accompany each bid. Bidder shall contact Chad Shepherd, (765) 480-4037, to schedule access to areas being worked on. Indiana State Gross Retail and Use Tax is not to be included in the Bid Price, as Kokomo School Corporation is tax exempt. The provision shall apply both to transactions between Kokomo School Corporation and the Unified Contractor and any subcontractors, and to transactions between the material suppliers to the Unified Contractor and any subcontractors. A Performance Bond and Payment Bond in the amount of 100% percent of the contract price shall be required upon notification of the successful bidder prior to signing of the contract. Bids shall not be modified, of ninety (90) calendar days commencing from the day bids are received. All bids shall be itemized, and all signatures must include the corporate position of the signer and shall be properly notarized. The successful bidder will be required to furnish insurance covering Workmen's Compensation, Public Liability and Property Damage, and any other which may be required, before the contract can be signed and issued. The Owner reserves the right to waive any formalities and informalities or to reject any and all bids. The Owner shall accept bids which, in his judgment, are in his own best interests, subject to the limitations of Indiana law. Bids received after the time set to receive bids shall be returned unopened. The construction must be completed as follows: 1. Board Meeting to award contract is March 6, 2023. 2. The softball field will be used and will not be available for construction until after the Girls' State Tournament at the end of May, 2023. Final date to be determined. 3. The softball fields' substantial completion to be August 11, 2023. 4. Softball fields' final completion is to be August 25, 2023.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents