Similar Projects
Clean Streams Water Treatment Facility
New Construction, Infrastructure - 22,000 SF
Design
$18,000,000 CJ est. value
Three Rivers, MI 49093

Playground Surface, Equipment and Structures - Jerolene Elementary School and Sturgis Central Commons
Infrastructure
Bidding
$300,000 CJ est. value
Sturgis, MI 49091

Three Rivers Middle School Additions and Renovations
Addition, Demolition, Renovation, Infrastructure
Sub-Bidding
$419,911 CJ est. value
Three Rivers, MI 49093

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Thurston Woods Splash Pad Development
Infrastructure
Post-Bid
$200,000 CJ est. value
Sturgis, MI 49091

FY21Pump Station Repairs at Dolphin Jefferson Outlet Station
Renovation
Results

Stapleton Park Proposed Pump Station
New Construction
Results
Sturgis, MI

H2 Self Storage
New Construction, Infrastructure - 54,000 SF
Pending Verification
$5,500,000 CJ est. value
Three Rivers, MI 49093

USDA Wastewater System Improvements Project Contract 1 - WWTF Improvements
Infrastructure
Post-Bid
$300,000 CJ est. value
Constantine, MI 49042

East Lafayette Road and North Franks Avenue utility Extension-Phase I
Infrastructure
Results
Sturgis, MI 49091

Broadway Street Resurfacing
Infrastructure
Post-Bid
$500,000 CJ est. value
Three Rivers, MI 49093

Contract B - Wastewater Treatment Plant & Pump Station Improvements
New Construction, Infrastructure
Results
$5,179,000 CJ est. value
Three Rivers, MI 49093

2023 CIPP Lining
Infrastructure
Post-Bid
$400,000 CJ est. value
Three Rivers, MI 49093

Three Rivers Community Schools - New Transportation Facility
New Construction, Infrastructure - 9,300 SF
Results
$4,650,635 CJ est. value
Three Rivers, MI 49093

Hot Mix Asphalt Overlay, Aggregate Shoulders and Pavement Markings on Fawn River
Infrastructure
Results
$554,731 CJ est. value
Sturgis, MI 49091

Last Updated 01/17/2023 11:45 AM
Project Title

USDA Wastewater System Improvements Project Contract 1 -WWTF Improvements

Physical Address View project details and contacts
City, State (County) Constantine, MI 49042   (Saint Joseph County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $13,900,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

A. The work consists of improvements to the Village of Constantine Wastewater Treatment Facility (WWTF). B. Major Work items include, but are not limited to, the following: 1. Demolition of existing low lift station, grit and screening structure, primary clarifiers, chemical storage structure, existing chemical building, and miscellaneous site structures. 2. Demolition of select site piping and manholes. 3. Demolition of existing process equipment. 4. Rehabilitation of existing administration building and tanks. 5. Construction of a new influent pump station and metering structure. 6. Construction of a new headworks building with screening, grit removal, and ancillary equipment. 7. Provide new mixed bed biofilm reactor (MBBR) system within the existing aeration basins, related blowers, and ancillary equipment. 8. Provide new secondary clarifier equipment. 9. Construction of flow splitting structures for the MBBR and secondary clarifiers. 10. Construction of new ultraviolet (UV) disinfection system and effluent metering. 11. Provide new plant effluent sewer and construction of new outfall structure. 12. Provide new sludge pumping, aerobic digestion, and biosolids thickening equipment. 13. Provide new biosolids storage tank cover and biosolids loading station. 14. Construction of new bulk chemical storage tank structure and provide new chemical feed equipment. 15. Provide all related site piping, electrical, controls, and associated items. 16. Provide site fencing, seeding, and all site restoration. 17. Coordination with power utility company and Owner for the removal of power poles and relocation of power feeds underground to the High Lift Station and to the Treatment Facility. Demolition of existing structures, buildings, piping, and equipment. Construction of a new triplex influent pump station, new headworks building with screening and grit removal, a new MBBR biological treatment system, rehabilitation of the existing clarifiers, lab building, and digesters. Implementation of a new ultraviolet disinfection system with new effluent outfall. The project also includes solids handling upgrades, pumps, piping, and valves, chemical feed systems, electrical and instrumentation, SCADA, painting, site improvements, site fencing, and all related work.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents