Similar Projects
Camden Center Chiller CHR-1 Replacement
Renovation
Sub-Bidding
$400,000 CJ est. value
Kingsland, GA 31548

James M Baker Center Chiller Replacement
Renovation
Sub-Bidding
$400,000 CJ est. value
Morrow, GA 30260

Classic Ctr New Arena Facility Energy
Alteration
Post-Bid
Athens, GA

Selective Improvements at Four Developments
Alteration
Post-Bid
$350,000 est. value
Metter, GA

HVAC Maintenance for The Jail
Results
$100,000 to $112,000 est. value
Athens, GA 30605

Passenger Boarding Bridge PC Air Unit Replacements
Alteration
Results
Savannah, GA 31408

Cooling Tower Replacement - Building B - Marietta
Renovation
Sub-Bidding
$300,000 CJ est. value
Marietta, GA 30060

HVAC Maintenance
Alteration
Post-Bid
Metter, GA 30439

Newnan Campus TERV Replacement
Alteration
Results
$318,427 est. value
Newnan, GA 30263

HVAC Renovation for Funston Elementary School
Renovation
Sub-Bidding
$800,000 CJ est. value
Funston, GA 31753

Annual Contract for Chiller and Cooling Tower Preventative Maintenance and Repair Services
Term Contract
Post-Bid
GA

GCSU Centennial AHU-BU Modifications
Alteration
Results
Milledgeville, GA 31061

HVAC Renovation for Stringfellow Elementary School
Renovation
Sub-Bidding
$700,000 CJ est. value
Moultrie, GA 31768

Annual HVAC Preventative Maintenance Program
Alteration
Post-Bid
Garden City, Pooler, Savannah, Tybee Island, GA 31401

Hood Cleaning
Term Contract
Results
Dexter, Dublin, Dudley, Eastman, Hawkinsville, Milledgeville, Pinehurst, Rentz, Vienna, Wrightsville, GA

Last Updated 12/06/2022 01:04 AM
Project Title

Coweta Charter Academy Replacement of Rooftop HVAC Units

Physical Address View project details and contacts
City, State (County) Senoia, GA 30276   (Coweta County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

We kindly request your company to submit a quotation to replace 6 Carrier Split Air Conditioner units (supply, installation, and testing A/C split package units) at Coweta Charter Academy located at 6675 E. GA-16, Senoia, GA 30276. When preparing your quotation, please be guided by the scope of work below. Scope of work: o Furnish and complete install of 6 New Carrier split systems (5 and 4 tons each). o Provide labor and materials to remove existing units and install new units. o Provide labor and materials to disconnect electrical and re-connect electrical to new units.o Provide labor and materials to disconnect refrigerant lines and reconnect refrigerant lines. o Provide labor to disconnect existing ductwork and reconnect. o Furnish and install new GPS air filtration devices. o Provide labor and materials to install new insulation for refrigerant lines as needed. o Provide labor and materials to disconnect and reconnect gas lines to furnace. o Provide labor and materials to start up new equipment and check operations. o Provide crane to set new units on the roof o Provide transportation of new units to job site and removal of old units. o Provide labor and materials to dispose of old units properly. o Furnish and install New Honeywell Controls to match existing building controls and GPS air filtration device. o Start up and check operation of new units. Bid Questions Due: Monday, November 14, 2022 Addendums Posted: Monday, November 21, 2022 If any questions should arise pertaining to the Bid documents, the Bidder may request interpretation, in writing, to: jgilreath@charterschoolsusa.com. o Furnish and complete install of 6 New Carrier split systems (5 and 4 tons each). o Provide labor and materials to remove existing units and install new units. o Provide labor and materials to disconnect electrical and re-connect electrical to new units. o Provide labor and materials to disconnect refrigerant lines and reconnect refrigerant lines. o Provide labor to disconnect existing ductwork and reconnect. o Furnish and install new GPS air filtration devices. o Provide labor and materials to install new insulation for refrigerant lines as needed. o Provide labor and materials to disconnect and reconnect gas lines to furnace. o Provide labor and materials to start up new equipment and check operations. o Provide crane to set new units on the roof o Provide transportation of new units to job site and removal of old units. o Provide labor and materials to dispose of old units properly. o Furnish and install New Honeywell Controls to match existing building controls and GPS air filtration device. o Start up and check operation of new units.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents