Similar Projects
Bristol-Main Mixed-Use Development
New Construction, Infrastructure
Conception
$35,000,000 CJ est. value
Sun Prairie, WI 53590

Madison - Deforest Const / Replace Pavement Nb / PVRPLA
Infrastructure
Conception
$3,000,000 CJ est. value
McFarland, WI 53558

Diventures / Sun Prairie
New Construction, Infrastructure - 10,500 SF
Design
$2,500,000 CJ est. value
Sun Prairie, WI 53590

Braxton Pl Resurfacing and La Mariposa Lane (New Street)
Infrastructure
Design
$900,000 CJ est. value
Madison, WI 53715

Cannonball Path Phase 6
Infrastructure
Bidding
$730,000 CJ est. value
Madison, WI 53715

Safe Streets Madison 2022 - Group 2
Infrastructure
Bidding
$700,000 CJ est. value
Madison, WI 53715

Culver's - Site Work Only / Oregon
Infrastructure
Sub-Bidding
$300,000 CJ est. value
Oregon, WI 53575

Woodland Crest Multifamily - BP #3
New Construction, Infrastructure - 80,633 SF
Sub-Bidding
$22,000,000 CJ est. value
Westport, WI 53597

Portillos
Alteration
Post-Bid
Madison, WI 53719

CDBG Minor Home Repair
Renovation
Post-Bid
WI

Mold Abatement and Site Restoration Services
Term Contract
Results
Madison, WI

Triangle Redevelopment Assistance
New Construction
Results
Dane, WI

Arrowhead Pharmaceuticals Manufacturing Building / Verona
New Construction, Infrastructure - 164,000 SF
Construction
$250,000,000 CJ est. value
Verona, WI 53593

Windsor Crossing
New Construction, Infrastructure
Pending Verification
$14,000,000 CJ est. value
Deforest, WI 53532

Belle Farm
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
Middleton, WI 53562

Last Updated 08/18/2022 02:08 PM
Project Title

Rosewood Fields - Phase 2

Physical Address View project details and contacts
City, State (County) McFarland, WI 53558   (Dane County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Single-Family Homes, Site Development
Contracting Method Bids by Invitation
Project Status Obtained from a credible source, Awaiting verification, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $7,500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of August 2022, a development plan has been submitted to the Village of McFarland. The developer is expected to serve as the homebuilder. Information regarding subcontractor bidding opportunities has not been released. Although a firm timeline for construction has not been confirmed, construction is not expected to commence prior to spring 2023.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Apartments, 22 Unit(s).
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents