Similar Projects
Dar Alnoor Expansion
Renovation, Addition - 76,276 SF
Conception
Manassas, VA 20122

The Madeira School
New Construction - 101,374 SF
Conception
$10,000,000 CJ est. value
McLean, VA 22102

Poquoson Middle School Renovations - Design Development
Renovation - 92,625 SF
Design
$17,000,000 est. value
Poquoson, VA 23662

Design Services for George Wythe High School Replacement
New Construction, Term Contract, Infrastructure - 300,000 SF
Bidding
Richmond, VA 23225

Architectural and Engineering Services for Hermitage and Highland Springs ACE Centers
New Construction, Renovation
Bidding
Less than $53,000,000 est. value
Henrico, VA 23228

Construction Manager Advisory Services for Various Arlington Public Schools Construction Projects
Post-Bid
Arlington, VA

Renovation of CTE Lab and New Switch Gear
Renovation
Post-Bid
Dublin, VA 24084

Replace HVAC and Remodel Front Offices at Grafton HS and MS
Results
Yorktown, VA 23692

PPEA for Design-Build of New High School
New Construction
Results
South Boston, VA 24592

Construction of a New Operations Center for Suffolk Public Schools
New Construction
Construction
$17,000,000 est. value
Suffolk, VA

Robert E. Aylor Middle School Replacement Project
New Construction - 147,355 SF
Construction
$48,700,000 est. value
Stephens City, VA 22655

CCS Vestibule Security Addition
Addition
Bidding
Charlottesville, VA 22901

Redevelopment Commissioning Services for New High School
New Construction - 320,425 SF
Post-Bid
$150,000,000 est. value
Alexandria, VA 22302

Original Mount Vernon High School Renovation and Adaptive Reuse
Renovation
Results
$55,000,000 est. value
Alexandria, VA 22309

Construction of the Westmoreland High School Replacement (Washington and Lee)
Construction
$44,500,000 est. value
Montross, VA 22520

Reported 07/09/2021 12:00 AM
Project Title

Construction Managers for Rivers Head Middle School and Buffalo Gap Middle School

Physical Address View project details and contacts
City, State (County) Staunton, Swoope, VA 24479   (Augusta County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids. Construction Management - CM at Risk.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value $47,000,000
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The preliminary budget for these projects has been set at $47,000,000. Providing pre-construction and construction services for multiple school renovation capital project. Responses to this request for qualifications will be evaluated to identify CMs with prerequisite experience, qualifications, and resources to complete the project successfully. Included in the construction scope of services is collaboration with the design professionals during the design phase, attendance of design coordination meetings, constructability reviews, value engineering guidance, construction scheduling, development and negotiation of a guaranteed maximum price (GMP) proposal for construction services.

Details

Middle/Senior High School, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents