Similar Projects
Replace Building F and H Hot Water Tanks
Alteration
Bidding
$400,000 est. value
Farmington, CT

Boiler Replacement- Csdnb Holmes, Jefferson, Diloreto, Smith Schools
Alteration
Post-Bid
New Britain, CT

Town Hall Boiler Replacement
Alteration
Post-Bid
Southington, CT 06489

Capitol Gas Hot Water Boiler
Term Contract
Results
$1,018,205 est. value
Hartford, CT 06106

Town Hall Chiller Replacement
Results
Manchester, CT 06040

HVAC and Boiler Systems Preventative Maintenance Services
Alteration
Post-Bid
East Hartford, Hartford, Middletown, New Britain, CT 06114

Replacement Burners for Boilers at Manchester High School
Results
Manchester, CT 06040

Gideon Welles School Boiler Replacement
Alteration
Post-Bid
Glastonbury, CT 06033

Mechanical Services Trades at Various Water Pollution Control Facilities
Results
Enfield, CT

Selective Boiler Replacement Project At Terry Court
Alteration
Post-Bid
Bristol, Windham, CT 06226

Boiler Replacement at Illing Middle School
Results
Manchester, CT 06040

South Windsor High School Heat Pump Replacements
Results
South Windsor, CT 06074

Hanmer Elementary School Boiler Replacement
Results
Wethersfield, CT 06109

Boiler Replacement at Meadow Hill Apartments
Alteration
Results
East Hartford, CT 06108

Boiler Replacement at 51 High Street
Alteration
Results
Bristol, CT 06010

Reported 05/13/2022 12:00 AM
Project Title

MacDougall Freezer Replacement

Physical Address View project details and contacts
City, State (County) Suffield, CT 06078   (Hartford County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $120,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Daily access into the freezer and for security. Removal of old freezer panels and associated equipment to allow for access of personnel, materials and equipment. Selectively straight saw cut the heaved CIP concrete slab +/- 5 from freezer wall into 2 x 2 cubes & remove to dumpsters (disposal included). Excavate soils to remove broken defrost piping under the slab & dispose into dumpsters. Place storm water infiltrator on compacted soils filled with crushed stone & covered with filter fabric. Install drain pipe into infiltrator & stub up. Drill & pin perimeter of existing concrete with # 5 rebar in preparation for CIP concrete. Bring in aggregate & bring to subgrade, compact. Place 4 of rigid insulation on prepared subgrade. Pour 5 of 4000# air entrained concrete with integral fiber mesh. Pull concrete cylinders for break analysis at Materials Testing Lab Inc. Results/reports to be provided to customer at end of project. Ensure floor drain & Rectorseal trap sealer is installed. Pitch concrete to drain. Two-day cure & return to shot blast or grind fresh concrete to accept Dur-A-Flex Polycrete MDB floor system with an integral 6 cove base and topcoat in any standard color offered by Dur-A-Flex. Total thickness of ΒΌ for special flooring. Cure & place. Install a new freezer unit complete with all associated equipment comparable to or to exceed the existing freezer unit in place currently. Remove temporary door & relay masonry to close up opening. CMU is by Westbrook Block Co ? natural grey with natural grey mortar. Econo-Brick close possible match. General broom clean of work area & demobilize. All specification and warranty documents to be submitted to DOC. at the beginning of the project

Details

Division 11 - Equipment, Foodservice Storage Equipment, Walk-In Freezers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents