Similar Projects
Biotechnology Center of Excellence Building
New Construction - 34,000 SF
Design
Less than $17,560,000 est. value
Graham, NC 27253

Culinary Expansion and Renovation
Renovation
Design
Graham, NC 27253

NCCU - New School of Business
New Construction - 75,000 SF
Sub-Bidding
$30,000,000 est. value
Durham, NC 27701

Fire and Emergency Training Center
New Construction - 28,393 SF
Sub-Bidding
Less than $16,000,000 est. value
Fayetteville, NC 28303

Carmichael Gymnasium Addition and Renovation
Post-Bid
$45,000,000 est. value
Raleigh, NC 27607

UNC School of Arts Performance Place Renovation and Addition
Renovation, Addition
Post-Bid
$5,300,000 est. value
Winston-Salem, NC

RTP Campus - General Classroom Building 2
Results
Less than $43,994,800 est. value
Raleigh, NC

UNC School of the Arts Work Place Dance Locker Rooms Fit-Up
Renovation
Results
Winston-Salem, NC

Health Science Building
New Construction - 55,000 SF
Construction
$13,736,250 est. value
Sylva, NC 28779

Taylor Campus Health Sports Medicine Renovation
Renovation - 12,000 SF
Construction
$1,900,000 to $2,225,508 est. value
Chapel Hill, NC 27599

Lyons Science Center Comprehensive Renovation
Renovation
Post-Bid
Fayetteville, NC 28301

North Carolina Agricultural and Technical State University Carver Hall Rooms 2nd Level Up-Fit
Results
Greensboro, NC

New Applied Technologies Building and Newton Building Renovation
New Construction, Renovation - 90,000 SF
Construction
$18,000,000 est. value
Durham, NC

Appalachian State University Sanford Hall Renovations/Addition
Renovation, Addition - 140,000 SF
Post-Bid
Jefferson, NC

Lower Campus Residence Hall Construction Manager at Risk
Results
$55,000,000 est. value
Cullowhee, NC

Reported 10/08/2020 11:28 AM
Project Title

Lineworker Training Building

Physical Address View project details and contacts
City, State (County) Wilmington, NC 28401   (New Hanover County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids.
Project Status Construction Documents
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

An approximately 6000 sf building with covered parking space for lineworker trucks, equipment storage, bathrooms, and an indoor training area. A systems construction building is envisioned. Sitework to include paved parking, underground drainage, extending utilities to the building, landscaping, and gravel or stabilized soil training areas.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents