Similar Projects
Traffic Signals at Highway 28 And Chatham Avenue - STR-16-011 - City of Norwalk
Infrastructure
Conception
Less than $336,000 est. value
Norwalk, IA 50211

Highway 28 Pedestrian Crossing/Signal Improvements - STR-17-027 - City of Norwalk
Infrastructure
Conception
$250,000 CJ est. value
Norwalk, IA 50211

Williams Terrace
New Construction, Infrastructure
Design
$5,600,000 CJ est. value
Indianola, IA 50125

Beach and Shelter Restroom, Lake Ahquabi State Park Warren County
New Construction, Infrastructure
Bidding
$412,000 CJ est. value
Indianola, IA 50125

Sewer Manhole Rehabilitation by Lining Process
Infrastructure
Post-Bid
$80,000 CJ est. value
Indianola, IA 50125

Storm Sewer - City Of Indianola
Infrastructure
Pending Verification
$600,000 CJ est. value
Indianola, IA 50125

Town Square Streetscape - City of Indianola
Infrastructure
Pending Verification
$4,700,000 CJ est. value
Indianola, IA 50125

High Road Rehabilitation Phase 1 - STR-16-008 - City of Norwalk
Infrastructure
Conception
$600,000 est. value
Norwalk, IA 50211

Norwalk Central
New Construction, Infrastructure - 35,000 SF
Pending Verification
$50,000,000 CJ est. value
Norwalk, IA 50211

Orchard Hills West Sanitary Sewer Expansion - SAN-19-001 - City of Norwalk
Infrastructure
Conception
$720,000 CJ est. value
Norwalk, IA 50211

Cemen Tech Expansion / Indianola
Addition, New Construction, Infrastructure - 9,833 SF
Pending Verification
$210,000 CJ est. value
Indianola, IA 50125

Bronze Street Trunk Sanitary Sewer - E104PW99 SS124 - City of Des Moines
Infrastructure
Conception
$1,800,000 CJ est. value
Norwalk, IA 50211

Johnson Creek Conveyance Phase 2 - 0510 009 2021 - City of West Des Moines
Infrastructure
Conception
$1,000,000 CJ est. value
West Des Moines, IA 50061

Wright Road - East 27th Water Main - WTR-20-002 - City of Norwalk
Infrastructure
Conception
$1,250,000 CJ est. value
Norwalk, IA 50211

Golden Valley Drive Reconstruction - STR-16-026 - City of Norwalk
Infrastructure
Conception
$882,000 CJ est. value
Norwalk, IA 50211

Last Updated 09/13/2022 04:01 AM
Project Title

Construction of Wastewater System Improvements

Physical Address View project details and contacts
City, State (County) Hartford, IA 50118   (Warren County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Demolition of the existing aeration equipment, associated electrical equipment and controls, and dredging the existing lagoon cells. Installation of a moving bed biofilm reactor (MBBR), (2) level control structures, (1) weir structure, valves, flow meter, associated piping, new UV disinfection and process building, new lagoon aeration equipment, new electrical equipment, controls, and alarms, and rehabilitation of the existing blower building. Work also includes grading, landscaping, utilities, controls, seeding, maintenance and compliance with a storm water pollution prevention plan (SWPPP), and all other miscellaneous work to complete the project in accordance with plans and specifications. The successful bidder will be required to furnish a corporate surety bond in an amount equal to one hundred per cent (100%) of the contract price, said bond to be issued by a responsible surety approved by the City, and shall guarantee the faithful performance of the contract and the terms and conditions therein contained, the payment for materials used in the project and the maintenance of said improvements in good repair for not less than one (1) year from the time of acceptance of said improvements by the City. The City reserves the right to defer acceptance of any proposal for a period not to exceed thirty (30) calendar days from the date of receipt of bids. The City reserves the right to reject any or all bids and to waive informalities. Liquidated damages in the amount of $500 per calendar day will be assessed for each day that the work shall remain uncompleted after the above referenced completion date with due allowance for extensions of the contract period due to conditions beyond control of the Contractor. PROJECT ADDRESS: S20 T77N R22W HARTFORD, IOWA 50118

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents